Question

What is safety time with regard to project scheduling? Is safety time necessary for projects? What...

What is safety time with regard to project scheduling? Is safety time necessary for projects? What types of safety times are most appropriate?

Homework Answers

Answer #1

Safety time is considered as the buffer in terms of quantity or time while.planning for a project effectively. If we consider that an organization requires a certain product and they need to order the same. Hence, the ideal situation here will be to order the product maintaining a stock that will suffice till the order or shipment is received by the organization and this is done so that there is no out of stock issues. I believe that safety stock or time is important for projects so that there is no stoppages in the work or project because that will affect the project to quite some extent and delay the process which is not at all required.

Dynamic safety time is the most appropriate according to me where the stock changes based on the demand and requirements of clients. Hence this will help the organization or project understand the actual trend and demand and based in that.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
What is safety time with regard to project scheduling? Is safety time necessary for projects? What...
What is safety time with regard to project scheduling? Is safety time necessary for projects? What types of safety times are most appropriate?
what is supply-to-inventory philosophy of scheduling How is just-in-time scheduling different from the supply-to-inventory philosophy of...
what is supply-to-inventory philosophy of scheduling How is just-in-time scheduling different from the supply-to-inventory philosophy of scheduling? need detailed answer please.
1) Two competing safety projects each cost the same amount. Project A reduces the likelihood of...
1) Two competing safety projects each cost the same amount. Project A reduces the likelihood of death for 1,000,000 people by 0.000001 (1/1,000,000) each, whereas project B reduces the likelihood of death for 1,000 people by 0.001 (1/1,000) each. If one and only one of these projects is to be undertaken (i.e., they are mutually exclusive and doing neither is not an option), which option should you do? Explain your answer.
Question 8 of 21 Gantt charts are effective for project scheduling if: A. Activities are highly...
Question 8 of 21 Gantt charts are effective for project scheduling if: A. Activities are highly interconnected B. Activity times are random C. The project contains simple activity sequences D. All of the above Reset Selection Question 9 of 21 Which of the following is NOT included in project control? A. Monitoring costs, time, and performance B. Adhering to the budget C. Correcting the plan as necessary D. All of the above are included Reset Selection Question 10 of 21...
Exercise 4: Projects with Different Time Length There are two projects under consideration: •Project A has...
Exercise 4: Projects with Different Time Length There are two projects under consideration: •Project A has an NPV of $20m and will last three years. •Project B has an NPV of $60m and will last nine years. It is anticipated that if either project is chosen it will be possible to repeat it for the foreseeable future.  The interest rate is 1% per year.  Which project will have a higher EANB and why?
Why does the scheduling function depend on the planning function? Which one must be done first?...
Why does the scheduling function depend on the planning function? Which one must be done first? Why? Describe what an activity estimated duration is. How is it determined? Why might a contractor prefer to state a project completion time in terms of number of days after the project starts rather than a specific date? Give some examples of instances when this would be appropriate. Why is it important to determine the critical path of a project? What happens if activities...
When you click a project in the Projects list, the screen that appears shows what project...
When you click a project in the Projects list, the screen that appears shows what project information? Income, costs, and profit margin Time and expense transactions associated with the project. Invoices associated with the project all of these answers
What is the average waiting time for Processes If the Operating System uses the Priority Scheduling...
What is the average waiting time for Processes If the Operating System uses the Priority Scheduling (PS) Scheduling Algorithm? (P1=20 ms, P2=15 ms, P3=10 ms, P4=5 ms) Priority Order: P1, P4, P3, P2
Paraphrasing this for me. Thank you Introduction Scheduling and project management is key to any mining...
Paraphrasing this for me. Thank you Introduction Scheduling and project management is key to any mining operation in achieving the most profitable and time-efficient strategy. A Gantt chart has been developed to outline the cost and time frame requirements of the overall task. Individual task breakdown including cost and time analysis is also outlined in the Gantt chart. Block cave mining for this project has been approved and the underground development needs to be scheduled. Block cave mining is a...
Novell, Inc., has the following mutually exclusive projects.    Year Project A Project B   0 –$28,000...
Novell, Inc., has the following mutually exclusive projects.    Year Project A Project B   0 –$28,000    –$31,000      1 16,000    17,000      2 12,500    11,000      3 3,700    12,500       a-1. Calculate the payback period for each project. (Do not round intermediate calculations and round your answers to 3 decimal places, e.g., 32.161.)        a-2. If the company's payback period is two years, which, if either, of these projects should be chosen? Project A Project...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT