Question

Question 1. How many statements are true? (A) 0 (B) 1 (C) 2 (D) 3 (E)...

Question 1. How many statements are true? (A) 0 (B) 1 (C) 2 (D) 3 (E) 4

Statement 1. Scheduled receipts are future receipts of past order releases

Statement 2. The MPS contains the GR of the end -item.

Statement 3. The POR is the inventory policy of the MRP

Statement 4. MRP minimizes cost.

Homework Answers

Answer #1

Answer: The given statements are evaluated as follows :

Statement 1: The given statement is True because scheduled receipts are open orders already placed in the past scheduled to arrive in the near future.

Statement 2:The given statement is True because Master Production Schedule (MPS) states which end items are to be produced, when they are needed, and in what quantities. (Gross Requirments )

Statement 3: The given statement is True as Planned Order Receipts (POR) is an inventory policy under MRP. It can be of various types like Lot-for-Lot ordering and others.

Statement 4: The given statement is True as MRP(Material Requirement Plan) helps in lowering the inventory levels and their associated holding costs.

Conclusion - Option E - 4 statements are true is correct.


Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Given the following data, develop MRP tables and indicate the Planned order releases for all items....
Given the following data, develop MRP tables and indicate the Planned order releases for all items. A is an MPS item. A needs 2 C's and 3 F’s. F needs 3 C’s. (I eliminated scheduled receipts since the problem did not have scheduled receipts.) Period 6 7 8 GR-A 400 0 300 On hand inventory for all items is 200 and lead time for A is 1 period, and LT for all other items is 2 periods. Use lot-for-lot for...
Given the following data, develop MRP tables and indicate the Planned order releases for all items....
Given the following data, develop MRP tables and indicate the Planned order releases for all items. A is an MPS item. A needs 2 C's and 3 F’s. F needs 3 C’s. (I eliminated scheduled receipts since the problem did not have scheduled receipts.) Period 6 7 8 GR-A 400 0 300 On hand inventory for all items is 200 and lead time for A is 1 period, and LT for all other items is 2 periods. Use lot-for-lot for...
Given the following data, develop MRP tables and indicate the Planned order releases for all items....
Given the following data, develop MRP tables and indicate the Planned order releases for all items. A is an MPS item. A needs 4 C's, 2 F’s and 5 G’s. F needs 4 C’s and G needs 2 C’s. (I eliminated scheduled receipts since the problem did not have scheduled receipts.) Period 6 7 8 GR-A 0 100 900 On hand inventory for all items is 300 and lead time for A is 1 period, and LT for all other...
Question 18 Product D has gross requirements, on-hand inventory, and scheduled receipts as indicated in the...
Question 18 Product D has gross requirements, on-hand inventory, and scheduled receipts as indicated in the time-phased inventory status record below. Its lead time is 3 weeks. Item D 1 2 3 4 5 6 Gross Requirements 100 300 100 400 100 50 On Hand/ Scheduled Receipts 700 Net Requirements A Planned Order Releases B The value of entry A is: A. 100 B. 200 C. 300 D. 700 E. None of the above. Reset Selection Question 19 Product D...
TASK:   Complete the MRP record for component C as it would appear at the beginning of...
TASK:   Complete the MRP record for component C as it would appear at the beginning of week 2. MRP record for component C as it would appear at the beginning of week 1. Week 1 2 3 4 5 6 Gross Requirements 15 30 25 25 10 20 Scheduled Receipts 40 0 0 0 0 0 Projected Available Balance 50 20 35 10 0 20 Planned Order Receipts 0 0 40 0 0 40 Planned Order Releases 40 0 0...
Problem L You work for a landscaping company. You need four poles and 2 cubic yards...
Problem L You work for a landscaping company. You need four poles and 2 cubic yards of mulch for every tree that is planted. Calculate the Material Requirements Plan below. The beginning inventory for each item has been given. Week Beg. Inv. 1 2 3 4 5 6 7 8 Quantity 72 65 30 64 Tree Lead Time = 1 wk Lot for Lot Gross Requirements Scheduled Receipts Projected On-Hand 2 Net Requirements Planned Order Receipts Planned Order Releases Poles...
Question 9.  [Video-2.  EOQ] Consider the relationship EOQ=sqrt(2*D*Co/Cc).  Constant demand is 1560 items/year.   If the unit ordering cost is...
Question 9.  [Video-2.  EOQ] Consider the relationship EOQ=sqrt(2*D*Co/Cc).  Constant demand is 1560 items/year.   If the unit ordering cost is $490/order and the unit carrying cost is $1.5/item/week, then how many statements are true for zero safety stock?     (A) 0   (B) 1   (C) 2   (D) 3     (E) 4 Statement 1.  EOQ is 120 Statement 2.  At EOQ, the total weekly ordering cost is $105 Statement 3.  At EOQ, the total monthly carrying cost is $455 Statement 4.  At EOQ, the total annual inventory cost is $10920 . . .
Given the following data, develop MRP tables and indicate the Planned order releases for all items....
Given the following data, develop MRP tables and indicate the Planned order releases for all items. A is an MPS item. A needs 4 C's, 2 F’s and 5 G’s. F needs 4 C’s and G needs 2 C’s. (I eliminated scheduled receipts since the problem did not have scheduled receipts.) Period 6 7 8 GR-A 0 100 900 On hand inventory for all items is 300 and lead time for A is 1 period, and LT for all other...
Product Y is made from one component P, three components Q, and one 2 components R.  P...
Product Y is made from one component P, three components Q, and one 2 components R.  P is made from two parts S, Q is made from one S, and R is made from two part S and three part T.  Other data includes: Part                 Lead time             Lot size                   On hand                 Scheduled receipts         Safety Stock Y                         1                                 lot-for-lot               30                                              none                                          5 P                        2                                   40                              15                                              none                                          none Q                        2                                 100                               8                                               none                                          8 R                        3                                 120                             30                                              none                                          none S                         2                                 500                             20                                              500, week 1                          20 T                         2                                 600                           370                                             none                                          50 a.    Draw the BOM for product Y. b. Complete the MRP explosion for product Y.  Identify any problems, and discuss possible solutions Master Production Schedule Finished...
1. Concerning the Master Production Schedule (MPS), which of the following statements are true? Select all...
1. Concerning the Master Production Schedule (MPS), which of the following statements are true? Select all correct answers. A. A Level Production Strategy minimizes the need for extra capacity and allows for smooth labor operations. B. The MPS is the tie between production and sales. C. A drawback about applying a Chase Demand Strategy is that it may lead to high levels of inventory when demand is low. D. The MPS allows sales to know the Availability to Promise (ATP)...