Question

In a 4 machine production line Machines 1, 2,3 and 4 have scrap rates: 1.5%, 4%,...

In a 4 machine production line Machines 1, 2,3 and 4 have scrap rates: 1.5%, 4%, 2%,

and 3.8% respectively. What is the overall acceptable quality percentage for the line?

Homework Answers

Answer #1

Let input quantity = 100.N

Since scrap rate in machine 1 is 1.5% . output from machine 1 is 98.5% of 100.N = 98.5N

Input to machine 2 = 98.5.N

Since scrap rate in machine 2 is 4% , output from machine 2 is 96% of 98.5.N = 94.56.N

Input to machine 3 = 94.56.N

Since scrap rate in machine 3 is 2% , output from machine 3 is 98% of 94.56.N = 92.67N

Input to machine 4 = 92.67N

Since scrap rate in machine 4 is 3.8% , output from machine 4 is 96.2% of 92.67.N = 89.14.N

Thus , while input to the line = 100.N , output from the line = 89.14.N

Therefore , acceptable quality percentage from the line = 89.14/100.N x 100 = 89.14%

OVERALL ACCEPTABLE QUALITY PERCENTAGE FOR THE LINE = 89.145

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A factory production line is manufacturing bolts using three machines, A, B and C. Of the...
A factory production line is manufacturing bolts using three machines, A, B and C. Of the total output, machine A is responsible for 25%, machine B for 35% and machine C for the rest. It is known from previous experience with the machines that 5% of the output from machine A, 4% from machine B and 2% from machine C is defective. A bolt is chosen at random from the production line and found to be non - defective. What...
A factory production line is manufacturing bolts using three machines, A, B and C. Of the...
A factory production line is manufacturing bolts using three machines, A, B and C. Of the total output, machine A is responsible for 25%, machine B for 35% and machine C for the rest. It is known from previous experience with the machines that 5% of the output from machine A, 4% from machine B and 2% from machine C is defective. A bolt is chosen at random from the production line and found to be  non - defective. What is...
Two currently owned machines are being considered for the production of a part. The capital investment...
Two currently owned machines are being considered for the production of a part. The capital investment associated with the machines is about the same and can be ignored for purposes of this example. The important differences between the machines are their production capacities (production rate×available production hours) and their reject rates (percentage of parts produced that cannot be sold). Consider the following table: Machine A                    Machine B Production rate 100 parts/hour 130 parts/hour Hours available for production 7 hours/day 6...
You have 3 parallel production lines which supply the assembly line. Acceptable quality percentage(AQP) for lines...
You have 3 parallel production lines which supply the assembly line. Acceptable quality percentage(AQP) for lines 1, 2, 3 are : 89%, 78%, 96%. Also OEE for lines 1, 2 and 3 are 70%, 90%, 80% What is the effective AQP for the three production lines up to assembly? In this question, up to means just at the point of entering to assembly. What is the effective OEE for the three production lines up to assembly? In this question also,...
A factory production line makes widgets using two machines, A and B. Of the total output,...
A factory production line makes widgets using two machines, A and B. Of the total output, machine A is responsible for 45%and machine B for 55%. It is known from previous experience with the machines that 5% of the output from machine A is defective and 2% from machine B is defective. A widget is chosen at random from the production line and found to be defective. What is the probability that it came from machine A. Give your answer...
A production line has three machines A, B, and C, with reliabilities of .99, .96, and...
A production line has three machines A, B, and C, with reliabilities of .99, .96, and .93, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line’s reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A, B, and C) would be used with reliabilities equal to the original...
A manufacturer has seven identical machines for the production. A typical machine breaks down once every...
A manufacturer has seven identical machines for the production. A typical machine breaks down once every 46 days and there are two repair workers, each of whom takes an average of 4 days to repair a machine. Breakdowns of machines follow a Poisson distribution and the repair time follows an exponential distribution. ( a ) What is the average number of machines waiting for repairs? ( b ) What is the average number of machines being served by a repair...
RUSH RUSH Decision making technics.. A company uses two machines (Machine 1 and Machine 2) to...
RUSH RUSH Decision making technics.. A company uses two machines (Machine 1 and Machine 2) to produce product A. Each hour of operation, Machine 1 produces 50 products and Machine 2 produces 75. It cost the company $250/hour, and $325/hour to operate Machine 1 and Machine 2, respectively. Machine 2 has to produce at least 30% of all products. If the two machines [together] must produce at least 500 products each day and each machine can run for at most...
Problem 1 Your company manufactures face masks and are concerned about the scrap rates of your...
Problem 1 Your company manufactures face masks and are concerned about the scrap rates of your 3 different plants. Particularly, you need to know is there is a difference in scrap rates per 1000 units produced by each Plant. You collect a sample of 4 observations per each Plant. The results are as follows: Plant A Plant B Plant C 11.4 11.1 10.2 12.5 14.1 9.5 10.1 16.8 9.0 13.8 13.2 13.3 You need to run a test with α...
The Borstal Company has to choose between two machines that do the same job but have...
The Borstal Company has to choose between two machines that do the same job but have different lives. The two machines have the following costs: Year Machine A Machine B 0 $47,000 $57,000 1 11,400 10,800 2 11,400 10,800 3 11,400 + replace 10,800 4 10,800 + replace These costs are expressed in real terms. 1. Suppose you are Borstal’s financial manager. If you had to buy one or the other machine and rent it to the production manager for...