Question

When working with heavy equipment, workers can benefit from each of these Workplace Design tools and/or...

When working with heavy equipment, workers can benefit from each of these Workplace Design tools and/or attributes

Homework Answers

Answer #1

When working with heavy equipment, workers can benefit from each of these Workplace Design tools and/or attributes

  • Workers should be given proper safety gears such as helmet, goggles, safety boots, fire and chemical resistant uniform, earplugs etc. to avoid any accident
  • Workers should be given repetetive training on safety rules and how to avoid it
  • They should be made to write an exam on safety rules before deploying them in the workplace consisting of heavy machinery
  • The system should be made error proof using Poka Yoke and other management tools to avoid accidents
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
What suggestions can you give ikea in india to discourage workers from working overtime?
What suggestions can you give ikea in india to discourage workers from working overtime?
Develop a decision map from the workers point of view for when it would or would...
Develop a decision map from the workers point of view for when it would or would not be rational for someone to vote to join a union. You should look at the following major points: pay, work benefits, workplace discrimination, the work environment, job security, likelihood of a union improving the situation. Be sure to give details about each decision criteria.
Read the articles below before your response. Workplace Pregnancy Bill Introduced Despite Opposition Pregnant Workers Fairness...
Read the articles below before your response. Workplace Pregnancy Bill Introduced Despite Opposition Pregnant Workers Fairness Act (Read Section 2.) Supporters of the Pregnancy Workplace Fairness Act say that it is a necessary law that will help employees. Opponents say that it will be too burdensome on employers. What do you think? Why? Here is the article: When Heather Wiseman began to suffer from bladder infections as a result of her pregnancy, the Walmart sales associate started carrying a water...
Increases in worker injuries and disability claims have prompted renewed interest in workplace design and regulation....
Increases in worker injuries and disability claims have prompted renewed interest in workplace design and regulation. As one particular aspect of this, employees required to do regular lifting should not have to handle unsafe loads. One study reported information regarding a random sample of 18 postal workers. The sample mean rating of acceptable load attained with a work-simulating test was found to be ? "=9.7 kg. Suppose we know that the standard deviation is ?=4.3 kg. Suppose that in a...
Canadian and Japanese workers can each produce 4 cars per year. A Canadian worker can produce...
Canadian and Japanese workers can each produce 4 cars per year. A Canadian worker can produce 10 tonnes of grain per year, whereas a Japanese worker can produce 5 tonnes of grain per year. To keep things simple, assume that each country has 100 million workers. a. Starting from a position without trade, give a numerical example in which trade makes each country better off. answer the part a
Assume we can buy a piece of equipment for 1.5 million dollars and that equipment has...
Assume we can buy a piece of equipment for 1.5 million dollars and that equipment has a three year life span. The project requires 150,000 in working capital. Sales from the piece of equipment will be 3.4 million annually with an operating margin of 22% and annual interest of 75,000.00 and a tax rate of 28%. If the salvage value is 150,000.00 what is the NPV of this project when the companies cost of capital is 7%?
1. Choose two forms from your own workplace that require written responses to open questions or...
1. Choose two forms from your own workplace that require written responses to open questions or prompts. The forms may be used to record injuries, incidents, customer complaints, OHS hazards, phone messages, maintenance requests or any other issues that require descriptive responses. Fill in the forms with your own details. You may report on actual situations that have occurred at your workplace, or make up scenarios that could possibly happen sometime. 2.  What are the three basic types of communication? Give...
The items of plant available to building contractors is extensively ranging from simple hand tools to...
The items of plant available to building contractors is extensively ranging from simple hand tools to very expensive equipment undertaking tasks beyond the capabilities of manual labour. Actually, contractors have many options to their own advantage when it comes to buying or hiring a plant. Enumerate the advantages of buying plant instead of hiring. b) Support the accession that records are important in construction plant maintenance. It is the normal practice of contractors who possess sufficient plant, to maintain their...
EC Interior Design and Construction Company Limited (“EC”) is a private company in Hong Kong specializing...
EC Interior Design and Construction Company Limited (“EC”) is a private company in Hong Kong specializing in residential and commercial interior design. It was founded by Mr Eagle Chan, an interior designer. For each project, Eagle first draws the design according to the client’s request. Then a team of construction workers complete the refurbishment. Eagle follows up the project and makes any necessary adjustment to his original design if the construction team meet any difficulty or if the client further...
Audit EC Interior Design and Construction Company Limited (“EC”) is a private company in Hong Kong...
Audit EC Interior Design and Construction Company Limited (“EC”) is a private company in Hong Kong specializing in residential and commercial interior design. It was founded by Mr Eagle Chan, an interior designer. For each project, Eagle first draws the design according to the client’s request. Then a team of construction workers complete the refurbishment. Eagle follows up the project and makes any necessary adjustment to his original design if the construction team meet any difficulty or if the client...