1) Meaning

MRP = Material Resource Planning/ Material Requirement Planning

It a tool used for planning of resources which will be required in the process of production

JIT = Just - In - Time

It is concerned with the time period of reaching of actual orders of raw materials in order to minimise the wastage

2) Aim

MRP

Its aim is to ensure the availability of materials for the production and delivery

JIT

It's aim is to reduce lead time and set up time

3) Sales Type

MRP

It uses the forecast sales for planning the resources

JIT

It uses the sales amount of actual orders

4) Suitability

MRP

It is suitable when there is Long lead times

JIT

It is suitable for short lead time

5) IMPACT ON PROCESS

MRP

It gives control to the system

JIT

It increases and enhances the value of the process

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Explain the difference between a position vs time, velocity vs time, and acceleration vs time graphs...
Explain the difference between a position vs time, velocity vs time, and acceleration vs time graphs for simple harmonic motion.
(International Management) Synchronous manufacturing vs. JIT How does the synchronous manufacturing process compare to the just-in-time...
(International Management) Synchronous manufacturing vs. JIT How does the synchronous manufacturing process compare to the just-in-time manufacturing process? Which do you believe would be more effective for a global company?
describe the relationship among aggregate planning, the master production schedule (MPS) and material requirements planning (MRP)....
describe the relationship among aggregate planning, the master production schedule (MPS) and material requirements planning (MRP). what are the key inputs and outputs for each system? what is the purpose of each of these tools?
Q1: POSITION VS TIME GRAPH The slope of the position vs. time graph is the _________________...
Q1: POSITION VS TIME GRAPH The slope of the position vs. time graph is the _________________ of the motion How is the position graph different for motion to the right (positive) and motion to the left (negative) How does the starting position change the position-time graph? When the slope of a position vs. time graph is zero, then the object is __________________________. When the slope is constant but not zero, the object is _______________________________________. When the slope is positive, the...
Would the application of a Just-In-Time production system affect how aggregate planning is conducted? Why? How?
Would the application of a Just-In-Time production system affect how aggregate planning is conducted? Why? How?
1. Why is the MRP curve downward sloping? What factors cause it to shift? Answer with...
1. Why is the MRP curve downward sloping? What factors cause it to shift? Answer with respect to the MRP for each of the factors of production. 2. Under what conditions is the labor supply curve upward sloping? When is it backward bending? What factors cause the labor supply curve to shift? Thank you!!
1) how is change in velocity shown on a position vs time graph? 2) how is...
1) how is change in velocity shown on a position vs time graph? 2) how is change in velocity shown on a velocity vs time graph? 3) how is change in velocity shown an acceleration vs time graph? 4) how can position be found from a velocity vs. time graph? 5) how can velocity be found from an acceleration vs. time graph? 6) how is acceleration shown on a position vs. time graph? 7) how is velocity shown on a...
Compare ATP production in Fermentation vs Respiration. Short answer if possible.
Compare ATP production in Fermentation vs Respiration. Short answer if possible.
SUBJECT: GAME THEORY Prior to just-in-time production techniques the Big 3 automakers would run shifts overtime...
SUBJECT: GAME THEORY Prior to just-in-time production techniques the Big 3 automakers would run shifts overtime just prior to wage negotiations so as to build up stockpiles of supplies. These firms were A)Trying to increase the amount of time they could sustain a strike. B) Trying to reduce their sweat factor. C) Both of the above. D) None of the above.
What benefits are there to learning higher level mathematics vs. just learning basic level?
What benefits are there to learning higher level mathematics vs. just learning basic level?
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT