1-Describe why a reduction in change over times is a prerequisite to successful levelled scheduling being introduced.
2-Outline the benefits that can be achieved through the introduction of levelled schedules.
Please write the answer in computerized mode(not handwriting)
CONCEPT OF LEVELLED SCHEDULING - IT IS USED IN JUST IN TIME PRODUCTION METHOD (JIT) LEVELLED SCHEDULE IS DEFINED AS IN WHICH EACH DAY CUSTOMER DEMAD IS SCHEDULED TO BE BUILT ON THE DAY IT WILL BE SHIPPED .A LEVEL SCHEDULED IS A OUTPUT OF THE LOAD LEVELLING PROCESS .
BENEFIT OF LEVELLED SCHEDULLED - 1 -MORE CUSTOMER SATISFACTION
-2- MORE RELIABILITY OF INDUSTRY
3 -LOW PROBABILITY OF REJCTION OF PRODUCT
- 4 -INCREASE LIFE OF PRODUCT
-5 -GOOD CUSTOMER RELATIONSHIP