Question

Q-1 Every hour a quality control inspector measures the outside diameter of four parts. The results...

Q-1 Every hour a quality control inspector measures the outside diameter of four parts. The results of the measurements are shown below.
Sample piece and Time
Time
1
2
3
4
9 A.M
1
4
5
2
10 A.M
2
3
2
1
11 A.M
1
7
3
5
(a) Compute the mean outside diameter, the mean range, and determine the control limits for the mean and the range. (b) Are the measurements within the control limits? Interpret the chart.
Q-2 Describe the difference between assignable variation and chance variation.
Q-3 Describe the difference between an attribute control chart and a variable control chart.

Homework Answers

Answer #1

Q1.

Q2.

Chance variation is random in nature and because the cause is a variety of factors it can-
not be entirely eliminated.

Assignable variation is not random, it is usually due to a specific cause and can be eliminated.

Q3.

Variable control charts are concerned with
actual measurements (weight, diameter, etc.).
Attribute control charts are based on a
classification of acceptable or not acceptable
(door lock either works or it does not).

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A new machine has just been installed to cut and rough-shape large slugs. The slugs are...
A new machine has just been installed to cut and rough-shape large slugs. The slugs are then transferred to a precision grinder. One of the critical measurements is the outside diameter. The quality control inspector randomly selected five slugs each half-hour, measured the outside diameter, and recorded the results. The measurements (in millimeters) for the period 8:00 a.m. to 10:30 a.m. follow. Outside Diameter (millimeters) Time 1 2 3 4 5 8:00 87.3 87.4 87.9 87.0 87.1 8:30 86.9 88.5...
Exercise 19-22 (LO19-4, LO19-6) A new machine has just been installed to cut and rough-shape large...
Exercise 19-22 (LO19-4, LO19-6) A new machine has just been installed to cut and rough-shape large slugs. The slugs are then transferred to a precision grinder. One of the critical measurements is the outside diameter. The quality control inspector randomly selected five slugs each half-hour, measured the outside diameter, and recorded the results. The measurements (in millimeters) for the period 8:00 a.m. to 10:30 a.m. follow. Outside Diameter (millimeters) Time 1 2 3 4 5 8:00 87.3 87.3 88.1 87.0...
Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from...
Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle​ neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions​ (in.) from the last six samples are Bottle Sample 1 2 3 4 1 0.617    0.582 0.602 0.610 2 0.596 0.606 0.615 0.574 3 0.591 0.594 0.580 0.593 4 0.613 0.616 0.613 0.591 5 0.622 00.596...
Please, complete the following exercises: 1. A Quality Control inspector wants to estimate the true population...
Please, complete the following exercises: 1. A Quality Control inspector wants to estimate the true population mean for the diameter of an extruded plastic rod. She samples 65 rods. The mean diameter is 2.18 inches. From previous work, the population standard deviation is known to be 0.2 inches. Find a 95% confidence interval for the true mean diameter of all plastic rods. 2.You work in Human Resources at Merrill Lynch. You plan to survey employees to find their average medical...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.58 1.3 14 95.22 0.6 15 95.04 0.8 16...
A new machine has just been installed to produce printed circuit boards. One of the critical...
A new machine has just been installed to produce printed circuit boards. One of the critical measurements is the thickness of the resistance layer. The quality control inspector randomly selects five boards each half-hour, measures the thickness, and records the results. The measurements (in millimeters) for the period 8:00 a.m. to 10:30 a.m. follow. Thickness (millimeters) Time 1 2 3 4 5 8:00 87.1 87.3 87.9 87.0 87.0 8:30 86.9 88.5 87.6 87.5 87.4 9:00 87.5 88.4 86.9 87.6 88.2...
1.       Twelve samples, each containing five parts, were taken from a process that produces steel rods....
1.       Twelve samples, each containing five parts, were taken from a process that produces steel rods. The length of each rod is the sample was determined. The results were tabulated and sample means and ranges were computed. Sample Sample Mean (in.) Range (in.) Sample Sample Mean (inches) Sample Range (inches) 1 10.001 0.011 2 10.003 0.014 3 9.995 0.007 4 10.007 0.022 5 9.997 0.013 6 9.999 0.012 7 10.001 0.008 8 10.006 0.014 9 9.994 0.005 10 10.002 0.010...
True or False 1.     T F Both S and R charts may be used to control...
True or False 1.     T F Both S and R charts may be used to control the mean of a process. 2.     T F When sampling a process to establish the control limits for a control chart of an average, we should typically take somewhere between n= 1 to n=6 items for each of the k samples 3.     T   F The acronym ARL stands for acceptable run length 4.     T F We would identify a process as being out of...
11.3.2 Levi-Strauss Co manufactures clothing. The quality control department measures weekly values of different suppliers for...
11.3.2 Levi-Strauss Co manufactures clothing. The quality control department measures weekly values of different suppliers for the percentage difference of waste between the layout on the computer and the actual waste when the clothing is made (called run-up). The data is in table #11.3.3, and there are some negative values because sometimes the supplier is able to layout the pattern better than the computer ("Waste run up," 2013). Do the data show that there is a difference between some of...
Please show your work 11.3.2 Levi-Strauss Co manufactures clothing. The quality control department measures weekly values...
Please show your work 11.3.2 Levi-Strauss Co manufactures clothing. The quality control department measures weekly values of different suppliers for the percentage difference of waste between the layout on the computer and the actual waste when the clothing is made (called run-up). The data is in table #11.3.3, and there are some negative values because sometimes the supplier is able to layout the pattern better than the computer ("Waste run up," 2013). Do the data show that there is a...