The company is expanding its production line to make metal cans out of different materials. These cans still hold 100 mL, but for these cans, the material for the base and top costs 7 ¢/cm2 while the material for the sides costs 2 ¢/cm2 . As before, find the dimensions of the container that minimize the cost of each container. We want to prove to your boss that these dimensions actually do minimize the cost. Accordingly, you include an argument as to why these dimensions MUST minimize the cost.