Question

The traffic flow rate (cars per hour) across an intersection is r ( t ) =...

The traffic flow rate (cars per hour) across an intersection is r ( t ) = 500 + 800 t − 180 t^2 , where t is in hours, and t =0 is 6am. How many cars pass through the intersection between 6 am and 10 am?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The traffic flow rate (cars per hour) across an intersection is r(t)=200+800t−240t^2, where t is in...
The traffic flow rate (cars per hour) across an intersection is r(t)=200+800t−240t^2, where t is in hours, and t=0 is 6am. How many cars pass through the intersection between 6 am and 8 am?
9) A company is considering expanding their production capabilities with a new machine that costs $37,000...
9) A company is considering expanding their production capabilities with a new machine that costs $37,000 and has a projected lifespan of 6 years. They estimate the increased production will provide a constant $6,000 per year of additional income. Money can earn 0.9% per year, compounded continuously. Should the company buy the machine? (a) Yes, the present value of the machine is greater than the cost by (b) No, the present value of the machine is less than the cost...
Cars pass an intersection at a rate of 18 per hour. What is the probability that...
Cars pass an intersection at a rate of 18 per hour. What is the probability that we have to wait at least 5 minutes before the next car passes?
Oil leaked from a tank at a rate of r(t) liters per hour. Values of the...
Oil leaked from a tank at a rate of r(t) liters per hour. Values of the rate at 2-hour intervals are given in the table below. time (hours)r(t) (liters per hour) 0 2 4 6 8 10 12 8.7 7.6 6.8 6.2 5.7 5.3 5.0 (a) Use a Left Hand Sum with n=3 subdivisions to give an approximation on the total amount of oil lost over the time interval from t=0 to t=12 hours. Include units in your answer. (b)...
1. On one approach of an intersection with fixed time traffic signal, vehicles arrival rate is...
1. On one approach of an intersection with fixed time traffic signal, vehicles arrival rate is 600 vehicles per hour. The effective green time for this approach is 30 seconds, the saturation flow of this approach is 1800 vehicles per hour and the cycle time of the intersection is 80 seconds. a. Evaluate the performance of the signal design i.e. will all vehicles clear during the green time? b. Recommend the changes to the green time for this approach to...
You work on a traffic management team for the city. There has been a proposal to...
You work on a traffic management team for the city. There has been a proposal to add a new lane to a road near a busy intersection. As part of the research into whether or not to build the new lane, the team would like to know how many cars, on average, pass through this intersection at peak hour each day (5 pm to 6 pm). Your colleague has developed the hypothesis that the population mean is 887. You intend...
Oil leaked from a tank at a rate of r(t) liters per hour. The rate decreased...
Oil leaked from a tank at a rate of r(t) liters per hour. The rate decreased as time passed, and values of the rate at two hour time intervals are shown in the table. Find lower and upper estimates for the total amount of oil that leaked out. V ≈ L (lower estimate) V ≈ L (upper estimate) t (h) 0 2 4 6 8 10 r(t) (L/h) 8.8 7.9 6.8 6.2 5.6 5.3
A data set of traffic stream characteristics, such as space mean speed (u: miles per hour),...
A data set of traffic stream characteristics, such as space mean speed (u: miles per hour), density (k: vehicles per mile) and traffic flow rate (q: vehicles per hour), was collected for a freeway lane. The data reveals a relationship between flow rate (q) and density (k) as calibrated below: q=66*(k-k^2/160) Where, q = flow rate of the lane (vehicles per hour); k = density of the lane (vehicles per mile). Answer the following questions: (1)Determine the free-flow space mean...
The output of a factory is changing at the rate Q′(t)  =  3t3 + 5t2 +...
The output of a factory is changing at the rate Q′(t)  =  3t3 + 5t2 + 4t + 7 units per hour, where t is the number of hours after the morning shift begins at 7:00 AM. How many units are produced between 9:00 AM and 11:00 AM?
Water leaks from a tank at a rate of 115−2?2‾‾‾‾‾‾‾‾√115−2t2 liters/ hour, where ?t is the...
Water leaks from a tank at a rate of 115−2?2‾‾‾‾‾‾‾‾√115−2t2 liters/ hour, where ?t is the number of hours after 7am. How much water is lost between 9:30 am and 11:30 am?