Question

A bucket is attached the bottom of a line of rope that hangs off the top...

A bucket is attached the bottom of a line of rope that hangs off the top of a tall

building. The bucket weights 5 pounds, the rope weighs 1/2 pounds per foot, and

the bucket and rope hang 100 feet down from the top of the building. How much

work is done in pulling the rope and bucket up to the top of the building?

Homework Answers

Answer #1

Work done for moving dh = Potential Energy = Wdh (W = weight, h = height)

Therefore, Workdone required = workdone for bucket + workdone for rope

Bucket,

Weigth is constant = 5 pounds

Therefore ,

Rope,

Weight depends on height = h X Weight per foot = h X (1/2) = h/2

Therefore ,

Thereby, total work done,

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A thin rope that is 100 ft. long and weighs 60 lbs. hangs over the edge...
A thin rope that is 100 ft. long and weighs 60 lbs. hangs over the edge of a vertical building. Attached to the bottom of the cable is a bucket, weighing 18 lbs. in total. By pulling up the cable, you want to lift the bucket 40 ft. up. Set up the integral(s) giving the work done in performing the task.
A leaky bucket full of sand has a mass of 25 pounds. The bucket is to...
A leaky bucket full of sand has a mass of 25 pounds. The bucket is to be lifted to the top of a building 15 feet tall by a rope weighing 1 lb/ft. Every foot the bucket is lifted results in a loss of 0.2 pounds of sand. Find the work done lifting the bucket to the top of the building.
Question 2) Suppose that you have a well that is 150 feet deep. Attached to the...
Question 2) Suppose that you have a well that is 150 feet deep. Attached to the top of the well is a 100 ft rope that weighs 15 lbs. Attached to the bottom of the rope is a 50 ft chain that weighs 40 lbs. Attached to the bottom of the chain is a bucket that weighs 5 lbs and is currently filled with 10 lbs of water. You lift the bucket (and rope and chain) up the well at...
Suppose that at the bucket in the previous problem has a hole in the bottom that...
Suppose that at the bucket in the previous problem has a hole in the bottom that allows one pound of sand per second to leak out of the bottom of the bucket. The sand leaks continusously in a steady stream. If the chain & bucket are pulled up at a rate of ½ foot per second, how much work is required to pull the chain and bucket to the top of the building? Previous problem Suppose that a bucket containing...
An object weighing 300 pounds is suspended from the top of a building by a cable...
An object weighing 300 pounds is suspended from the top of a building by a cable weigh- ing 1.2 pounds per foot. The cable is 100 feet long. Set up, but do not evaluate, an integral to calculate the work done in pulling the object to the top of the building
The total weight of a cable hanging from the ceiling plus the bucket it is attached...
The total weight of a cable hanging from the ceiling plus the bucket it is attached to is F(x)=1800−2x pounds when the bucket is x feet off the ground. What is the total work done in lifting the bucket 100 feet off the ground.
A 20 m rope with mass density of 0.5 kg/m hangs over the edge of a...
A 20 m rope with mass density of 0.5 kg/m hangs over the edge of a 10 m building. How much work is done pulling the rope to the top? (This is a calculus question, so please show how to solve using integrals!)
Suppose Jack on top of a 40-foot building, and a rope is hanging from the roof...
Suppose Jack on top of a 40-foot building, and a rope is hanging from the roof to the ground. If the rope weighs 3 pounds per foot, how much work does Jack perform if: a) he lifts the entire rope onto the roof? b) he lifts Mr. Q (weighing 250 pounds) from the ground halfway to the roof using the rope?
Expand PreviousNext Check 0/1 ptRetries 3Reattempts 19Info Details A bucket that has a mass of 10...
Expand PreviousNext Check 0/1 ptRetries 3Reattempts 19Info Details A bucket that has a mass of 10 kg when filled with sand needs to be lifted to the top of a 25 meter tall building. You have a rope that has a mass of 0.1 kg/m that must be secured to the bucket. It takes 1 meter of rope to secure the bucket. Once the bucket reaches the top of the building it only has mass 8 kg because there was...
Calculus Thomas 14th edition. Ch.6.5, problem 13. A 5 kg bucket lifted from the ground into...
Calculus Thomas 14th edition. Ch.6.5, problem 13. A 5 kg bucket lifted from the ground into the air by pulling in 20 m of rope at a constant speed. The rope weighs 0.08 kg/m. The work spent on bucket and rope is 1136.8 J. Assume that the bucket is leaking it starts with 5 liters of water (5 kg ) and leaks at the constant rate. It finishes draining just as it reaches the top. How much work was spent...