Analyze the following case study and choose the best option based on the following: According to...

Analyze the following case study and choose the best option based on the following:

According to the present-worth criterion, which option would you recommend at i = 12%?

Dynamic Corporation requires a chemical finishing process for a product under contract for a period of six years. Three options are available. Neither option 1 nor option 2 can be repeated after its process life. However, option 3 will always be available from Z&Z Chemical Corporation at the same cost during the period that the contract is operative.

Option 1: Process device A, which costs $100,000 has annual operating and labor costs of $60,000 and a useful service life of four years with an estimated salvage value of $10,000.

Option 2: Process device B, which costs $150,000, has annual operating and labor costs of $50,000 and a useful service life of six years with an estimated salvage value of $30,000.

Option 3: Subcontract out the process at a cost of $100,000

Answer the following 3 questions.

1. What is the equivalent Net Present Worth of Option 1?

a. $ -383,292
b. $ 383,292
c. $ 411,134
d. $ -411,134

2. What is the equivalent Net Present Worth of Option 2?

a. $ -310,899
b. $ -325,111
c. $ -340,371
d. $ -383,292

3. Which Option appears to be the best alternative?

a. Option 1
b. Option 2
c. Option 3

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
For the following problem, what is the better option? Use the present worth analysis with an...
For the following problem, what is the better option? Use the present worth analysis with an interest rate of 10%. A B Initial cost $12,500 $8,900 Annual benefit $6,800 $2,500 Salvage value $5,000 $8,900 Life in years 2 years 3 years
The present cash outflow is $3,000. You want to choose the option that best maximizes on...
The present cash outflow is $3,000. You want to choose the option that best maximizes on a 10% plus cash inflow over the course of four years. Investment A provides the following cash inflows: year 1 $0, year 2 $0, year 3 $3,000, and year 4 $0. Investment B provides the following cash inflows: year 1 $750, year 2 $750, year 3 $750, and year 4 $1,500. Investment C provides the following cash inflows: year 1 $1,000, year 2 $1,000,...
Brooks Clinic is considering investing in new heart-monitoring equipment. It has two options. Option A would...
Brooks Clinic is considering investing in new heart-monitoring equipment. It has two options. Option A would have an initial lower cost but would require a significant expenditure for rebuilding after 4 years. Option B would require no rebuilding expenditure, but its maintenance costs would be higher. Since the Option B machine is of initial higher quality, it is expected to have a salvage value at the end of its useful life. The following estimates were made of the cash flows....
A large refinery-petrochemical complex is to manufacture caustic soda, which will use feedwater of 10000 gallons...
A large refinery-petrochemical complex is to manufacture caustic soda, which will use feedwater of 10000 gallons per day. Two types of feedwater storage installation are being considered over the 40 years of their useful life. Option 1: build a 20000-gallon tank on a tower. The cost of installing the tank and tower is estimated to be $164000. The salvage value is estimated to be negligible.             Option 2: place a tank of 20000-gallon capacity on a hill, which is 150...
The production manager on the Ofon Phase 2 offshore platform operated by Total S.A. must purchase...
The production manager on the Ofon Phase 2 offshore platform operated by Total S.A. must purchase specialized environmental equipment or an equivalent service. The first cost is $250,000 with an AOC of $79,000. The manager has let it be known that he does not care about the salvage value because he thinks it will make no difference in the decision-making process. His supervisor estimates the salvage might be as high as $100,000 or as low as $10,000 in 3 years,...
Evaluate which of the following options would be your best investment based solely on the yield...
Evaluate which of the following options would be your best investment based solely on the yield to maturity criterion.     Option #1: Purchase a $20,000 discount bond selling for $16,200 and maturing in 6 years.            Option #2:  Purchase a $20,000 coupon bond with a 5.5% coupon rate selling for $10,600 and maturing in 6 years.     Option #3: Lend a reliable friend $15,000 with the agreement that she pays you $6,534.80 five years from now,                        $8,540.72 ten years from now, and $11,162.38 fifteen...
We need to purchase construction equipment. We have the choice of purchasing: • Item A, which...
We need to purchase construction equipment. We have the choice of purchasing: • Item A, which has an initial cost of $75,000, an annual fuel cost of $ 6,000/year, annual maintenance cost of $2,000 at the end of the first year that increase thereafter by $200 per year and a salvage value of $10,000 at the end of its 8-year life, and • Item B, which has an initial cost of $100,000, an annual fuel cost of $ 5,500/year, annual...
Matheson Electronics has just developed a new electronic device that it believes will have broad market...
Matheson Electronics has just developed a new electronic device that it believes will have broad market appeal. The company has performed marketing and cost studies that revealed the following information: a. New equipment would have to be acquired to produce the device. The equipment would cost $318,000 and have a six-year useful life. After six years, it would have a salvage value of about $18,000. b. Sales in units over the next six years are projected to be as follows:...
"Consider the following two options related to one of the old but special machine tools in...
"Consider the following two options related to one of the old but special machine tools in your machine shop. -Option 1: You continue to use the old machine tool that was bought four years ago for $12,000. It has been fully depreciated but can be sold for $1,800. If kept, it could be used for 3 more years with proper maintenance and with some extra care. No salvage value is expected at the end of 3 years. The maintenance costs...
Lego Group in Bellund, Denmark, manufactures Lego toy construction blocks. The company is considering two methods...
Lego Group in Bellund, Denmark, manufactures Lego toy construction blocks. The company is considering two methods for producing special-purpose Lego parts. Method 1 will have an initial cost of $320,000, an annual operating cost of $90,000, and a life of 3 years. Method 2 will have an initial cost of $520,000, an operating cost of $100,000 per year, and a 6-year life. Assume 13% salvage values for both methods. Lego uses an MARR of 10% per year. Which method should...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT