Maxwell Feed & Seed is considering a project that has the
following cash flow data. What is the project's IRR? Note that a
project's projected IRR can be less than the WACC (and even
negative), in which case it will be rejected.
Year | 0 | 1 | 2 | 3 | 4 | 5 |
Cash flows | -$6,750 | $2,000 | $2,025 | $2,050 | $2,075 | $2,100 |
|
|||
|
|||
|
|||
|
|||
|
Year | Cash flows |
0 | -6750 |
1 | 2000 |
2 | 2025 |
3 | 2050 |
4 | 2,075 |
5 | 2100 |
Method 1: IRR Calculation using ba ii plus calculator
Input the following values in a ba ii plus calculator
CF0 = -6750
C01 = 2000, F01 = 1
C02 = 2025, F02 = 1
C03 = 2050, F03 = 1
C04 = 2075, F04 = 1
C05 = 2100, F05 = 1
IRR -> CPT [Press IRR and then press CPT]
we get, IRR = 15.6104758
IRR = 15.61%
Method 2: IRR calculation using Excel
We can calculate the IRR of a project using the IRR function in Excel as shown below:
=IRR(B2:B7) = 15.61%
IRR = 15.61%
Answer -> 15.61% (Option a)