compute the reorder point when weekly demand is 100 units, lead time is 2 weeks, the...

compute the reorder point when weekly demand is 100 units, lead time is 2 weeks, the desired service level is 98% (which corresponds to z-2.06, standard deviations from the mean) and the standard deviation of demand during lead time is 30 units.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Use the information in the following table to answer the questions below: Demand 100 units per...
Use the information in the following table to answer the questions below: Demand 100 units per week Standard deviation of weekly demand 10 units Average lead time 10 days Standard deviation of the lead time 5 days Cycle service level 70 % Considering a continuous review system, Find the standard deviation of demand during the lead time. Find the safety stock. What is the reorder point?
For a particular SKU, the lead time is 6 weeks, the average demand is 100 units...
For a particular SKU, the lead time is 6 weeks, the average demand is 100 units a week, and safety stock is 200 units. What is the average inventory if 10 weeks’ supply is ordered at one time? What is the order point? The standard deviation of demand during the lead time is 100 units. Calculate the safety stock required for the following service levels: 75%, 80%, 85%, 90%, 95%, and 99.99%. Calculate the change in safety stock required to...
Lead Time Demand for an item we keep in stock is 420 units, with a standard...
Lead Time Demand for an item we keep in stock is 420 units, with a standard deviation of 44 units. What service level is achieved with our current Reorder point of 442 units? What Reorder Point should be used in order to accomplish a service level of 97%?
Consider a periodic review inventory system with a lead time of two weeks and a review...
Consider a periodic review inventory system with a lead time of two weeks and a review period of seven weeks. The standard deviation of weekly demand is 20 and the desired service level is 86%. Annual demand is 36,000 units and there are 50 weeks in the year. Currently, on hand inventory is 630 units. What should be the order quantity?
The annual demand for a product is 15,900 units. The weekly demand is 306 units with...
The annual demand for a product is 15,900 units. The weekly demand is 306 units with a standard deviation of 80 units. The cost to place an order is $33.50, and the time from ordering to receipt is eight weeks. The annual inventory carrying cost is $0.10 per unit. a. Find the reorder point necessary to provide a 99 percent service probability. (Use Excel's NORMSINV() function to find the correct critical value for the given α-level. Round "z" value to...
The reorder point r = dm is defined as the lead-time demand for an item. In...
The reorder point r = dm is defined as the lead-time demand for an item. In cases of long lead times, the lead-time demand and thus the reorder point may exceed the economic order quantity Q*. In such cases, the inventory position will not equal the inventory on hand when an order is placed, and the reorder point may be expressed in terms of either the inventory position or the inventory on hand. Consider the economic order quantity model with...
Problem 14-3 (Algorithmic) The reorder point r = dm is defined as the lead-time demand for...
Problem 14-3 (Algorithmic) The reorder point r = dm is defined as the lead-time demand for an item. In cases of long lead times, the lead-time demand and thus the reorder point may exceed the economic order quantity Q*. In such cases, the inventory position will not equal the inventory on hand when an order is placed, and the reorder point may be expressed in terms of either the inventory position or the inventory on hand. Consider the economic order...
Q. Daily demand for a product is normally distributed with a mean M= 12 units and...
Q. Daily demand for a product is normally distributed with a mean M= 12 units and standard deviation Q= 4 units. Lead time is 9 days. The order quantity for this item is set at a 12-day supply. a. If a minimum probability of satisfying demand per cycle of 0.80 is desired, what is the reorder point? b. If a fill rate of 9% is desired, what is the reorder point?
Weekly demand for the latest TV set at a retailer is normally distributed with a mean...
Weekly demand for the latest TV set at a retailer is normally distributed with a mean of 600 TVs and a standard deviation of 150. Currently, the store places orders to the supplier with a reorder point of 1,500 Tvs. Replenishment lead time is 2 weeks, fixed order cost per order is $200, each TV the retailer $300, and the inventory holding cost is 25% per year. If the retailer wants to achieve a 99% service level (use the z-value...
Gainesville Cigar stocks Cuban cigars that have variable lead times because of the difficulty in importing...
Gainesville Cigar stocks Cuban cigars that have variable lead times because of the difficulty in importing the? product: Lead time is normally distributed with an average of 5 weeks and a standard deviation of 3 weeks. Demand is also a variable and normally distributed with a mean of 175 cigars per week and a standard deviation of 25 cigars. Refer to the standard normal table LOADING... for? z-values. This exercise contains only parts a and b. ?a) For a 90?%...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT