Question

Different investor weights. Two risky portfolios exist for? investing: one is a bond portfolio with a...

Different investor weights. Two risky portfolios exist for? investing: one is a bond portfolio with a beta of 0.5 and an expected return of 6.5?%, and the other is an equity portfolio with a beta of 1.2 and an expected return of 16.6?%. If these portfolios are the only two available assets for? investing, what combination of these two assets will give the following investors their desired level of expected? return? What is the beta of each? investor's combined bond and equity? portfolio? a.???Bart: desired expected return 16?% b.???Lisa: desired expected return 14?% c.???Maggie: desired expected return 12?% a.??The combination of these two assets that will give Bart an expected return of 16?% is nothing?% in bonds and nothing?% in stocks.???(Round both answers to two decimal? places.)

Homework Answers

Answer #1

Bond Beta = 0.5, Expected Return = 6,5 %

Equity Beta = 1.2 and Expected Return = 16.6 %

(a) Let the bond weightage be D and equity weightage be 1-D

Required Return = 16 %

Therefore, 16 = D x 6.5 + 16.6 x (1-D)

D = 0.059 and 1-D = 0.941

Portfolio Beta = 0.5 x 0.059 + 1.2 x 0.941 = 1.1587

(b)

Let the bond weightage be D and equity weightage be 1-D

Required Return = 14 %

Therefore, 14 = D x 6.5 + 16.6 x (1-D)

D = 0.257 and 1-D = 0.743

Portfolio Beta = 0.5 x 0.257 + 1.2 x 0.743 = 1.0201

(c)

Let the bond weightage be D and equity weightage be 1-D

Required Return = 12 %

Therefore, 12 = D x 6.5 + 16.6 x (1-D)

D = 0.455 and 1-D = 0.545

Portfolio Beta = 0.5 x 0.455 + 1.2 x 0.545 = 0.8815

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Different investor weights. Two risky portfolios exist for​ investing: one is a bond portfolio with a...
Different investor weights. Two risky portfolios exist for​ investing: one is a bond portfolio with a beta of 0.5 and an expected return of 8.3​%, and the other is an equity portfolio with a beta of 1.2 and an expected return of 16.4​%. If these portfolios are the only two available assets for​ investing, what combination of these two assets will give the following investors their desired level of expected​ return? What is the beta of each​ investor's combined bond...
Risky Asset A and Risky Asset B are combined so that the new portfolio consists of...
Risky Asset A and Risky Asset B are combined so that the new portfolio consists of 70% Risky Asset A and 30% Risky Asset B.  If the expected return and standard deviation of Asset A are 0.08 and 0.16, respectively, and the expected return and standard deviation of Asset B are 0.10 and 0.20, respectively, and the correlation coefficient between the two is 0.25: (13 pts.) What is the expected return of the new portfolio consisting of Assets A & B...
Mutual fund separation method determines weights of risky securities by maximizing the Select one: a. portfolio...
Mutual fund separation method determines weights of risky securities by maximizing the Select one: a. portfolio beta. b. investor's utility. c. slope of Capital Allocation Line. d. portfolio return.
Which of the following statements regarding a portfolio of two risky assets (with almost equal weights)...
Which of the following statements regarding a portfolio of two risky assets (with almost equal weights) is true? A. For this portfolio, if investors do not invest in a risk-free asset, the feasible set simply includes the upward curve starting from the global minimum variance portfolio. B. A portfolio without a risk-free asset cannot earn a higher return than a portfolio with risk-free assets if these two portfolios have the same risk. C. If investors invest in a risk-free asset,...
You are considering investing $1,000 in a T-bill that pays 0.05 and a risky portfolio, P,...
You are considering investing $1,000 in a T-bill that pays 0.05 and a risky portfolio, P, constructed with two risky securities, X and Y. The weights of X and Y in P are 0.60 and 0.40, respectively. X has an expected rate of return of 0.14 and variance of 0.01, and Y has an expected rate of return of 0.10 and a variance of 0.0081. What would be the dollar value of your positions in X, Y, and the T-bills,...
You are considering investing $100,000 in a complete portfolio. The complete portfolio is composed of Treasury...
You are considering investing $100,000 in a complete portfolio. The complete portfolio is composed of Treasury notes that pay 1% and a risky portfolio, P, constructed with two risky securities X and Y. The optimal weights of X and Y in P are 60% and 40% respectively. X has an expected rate of return of 10% and Y has an expected rate of return of 6%. To form a complete portfolio with an expected rate of return of 4%, you...
Portfolio betas  Personal Finance Problem   Rose Berry is attempting to evaluate two possible​ portfolios, which consist...
Portfolio betas  Personal Finance Problem   Rose Berry is attempting to evaluate two possible​ portfolios, which consist of the same five assets held in different proportions. She is particularly interested in using beta to compare the risks of the​ portfolios, so she has gathered the data shown in the following​ table: Portfolio weights Asset Asset beta Portfolio A Portfolio B 1 1.75 15​% 20​% 2 0.72 30​% 15​% 3 1.73 15​% 25​% 4 1.54                 15​% 20​% 5       0.46   ...
You are considering investing $1,000 in a T-bill that pays 0.05 and a risky portfolio, P,...
You are considering investing $1,000 in a T-bill that pays 0.05 and a risky portfolio, P, constructed with two risky securities, X and Y. The weights of X and Y in P are 0.60 and 0.40, respectively. X has an expected rate of return of 0.14 and variance of 0.01, and Y has an expected rate of return of 0.10 and a variance of 0.0081. If you want to form a portfolio with an expected rate of return of 0.11,...
You are a financial advisor who offers investment advice to your clients. There are two risky...
You are a financial advisor who offers investment advice to your clients. There are two risky assets in the market: portfolio X and portfolio Y. X has an expected return of 15% and standard deviation of 35%. The expected return and standard deviation for Y is 20% and 45% respectively. The correlation between the two portfolios is 0.2. The rate of risk-free asset, T-bill, is 5%. a) Peter is one of your clients and he can only invest in T-bill...
An investor can design a risky portfolio based on two stocks, A and B. Stock A...
An investor can design a risky portfolio based on two stocks, A and B. Stock A has an expected return of 21% and a standard deviation of return of 37%. Stock B has an expected return of 16% and a standard deviation of return of 22%. The correlation coefficient between the returns of A and B is .5. The risk-free rate of return is 6%. The proportion of the optimal risky portfolio that should be invested in stock B is...