Compute the PI statistic for Project X with the cash flows shown below if the appropriate cost of capital is 10 percent.
Time 0 1 2 3 4
Cash Flow -$10,000 $3,500 $2,000 -$5,148 $6,000
A. 1.11
B. 0.42
C. 1.19
D. 1.25
Given about project X
current cost C0 = $10000
cost of capital r = 10%
expected future cash flow are as follow:
CF1 = $3500
CF2 = $2000
CF3 = -$5148
CF4 = $6000
So, PV of the future cash flow using compounding formula is
PV = CF1/(1+r) + CF2/(1+r)^2 + CF3/(1+r)^3 + CF4/(1+r)^4
=> PV = 3500/1.1 + 2000/1.1^2 - 5148/1.1^3 + 6000/1.1^4 = $5065.02
So, profitability index of the project is PV/C0 = 5065.02/10000 = 0.51
Given the data, profitability index of the project is 0.51
There is some problem with option available. Calculation and methods are explained properly above.