The local blood donor clinic is considering 3 sites for the location of its new clinic. It has collected the following information. Different SME’s (subject matter experts) scored each of the non-economic factors. So, unfortunately, the scores for the non-economic factors are scaled differently. The scales are indicated on the table. The highest score is always the best value. For each of the Non-economic factors, it is possible to score the maximum for that factor.
Factor |
Factor Weight |
Scale |
Site A |
Site B |
Site C |
Building Cost |
0.3 |
$4 million |
$5.0 million |
$3.5 million |
|
Non-economic factors |
|||||
Road Access |
0.25 |
1-5 |
2.5 |
4.0 |
5.0 |
Bus Access |
0.2 |
1-5 |
4.0 |
2.5 |
1.5 |
Safety |
0.2 |
1-4 |
3.5 |
3.0 |
4.0 |
Site Size |
0.05 |
1-3 |
2.0 |
1.5 |
2.5 |
Using the factor rating (scaling) approach we studied in class and modified as appropriate, which site do you recommend? Why?
Factor | Factor weight | Scale | Site A | Site B | Site c | ||||||
Wegihted scale | Wegihted scale | Wegihted scale | |||||||||
(a*b) | (a*c) | (a*d) | |||||||||
Building cost | 0.3 | $ 4 Million | $1.2 million | $ 5million | $1.2 Million | $ 3.5 Million | $1.05 Million | ||||
(a) | (b) | c) | d) | ||||||||
Non Economic factor | |||||||||||
Road Access | 0.25 | 1-5 | 2.5 | 0.625 | 4 | 1 | 5 | 1.25 | |||
Busy Access | 0.2 | 1-5 | 4 | 0.8 | 2.5 | 0.5 | 1.5 | 0.3 | |||
Safety | 0.2 | 1-4 | 3.5 | 0.7 | 3 | 0.6 | 4 | 0.8 | |||
Site Size | 0.05 | 1-3 | 2 | 0.1 | 1.5 | 0.075 | 2.5 | 0.125 | |||
Total Non Economic factor | 2.225 | 2.175 | 2.475 | ||||||||
As per calculation made in above table Site C is best because factor of building cost is less and Non Econmic factor is highest as compare with other |