Momentary start-stop switches and magnetic controllers are to be used to control the motors on two augers connected in series. The motor on the second auger (m2) must be operating before the first auger (m1) can be started. If the second auger overloads or is manually switched off the first auger will also shut down simultaneously. Construct a ladder diagram of the control circuit for this system.
Get Answers For Free
Most questions answered within 1 hours.