Question

. An Australian power transmission line is designed to deliver 100 MVA at 6.6 kV over...

. An Australian power transmission line is designed to deliver 100 MVA at 6.6 kV over a distance of 100 km. The total transmission line loss is not to exceed 2.5% of the rated line MVA. The magnitude of the leakage current due to the capacitive effect is 0.291 A. In this transmission system, you need to reduce this capacitive effect at least by 50%. In this situation, what type of compensation do you need? At the same time, you need to calculate the value of the compensator in terms of its original uni

Homework Answers

Answer #1

Here R is Resistance of transmission line due to this transmission powerloss occurs.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
An Australian (50HZ) power transmission line is designed to deliver 100 MVA at 6.6 kV over...
An Australian (50HZ) power transmission line is designed to deliver 100 MVA at 6.6 kV over a distance of 100 km. The total transmission line loss is not to exceed 2.5% of the rated line MVA. The magnitude of the leakage current due to the capacitive effect is 0.291 A. In this transmission system, you need to reduce this capacitive effect at least by 50%. In this situation, what type of compensation do you need? At the same time, you...
The generalized circuit constants (ABCD) of a 345 kV transmission line are given as: A =...
The generalized circuit constants (ABCD) of a 345 kV transmission line are given as: A = D = 0.82 + j0.019 B = 40 +j150 ohm C = (-1.35 + j193.3) x 10-6 S Do this problem using the per unit system. Hint: The sending end power and voltage will make good base values. a) At the sending end, the transmission line is delivering 400 MVA at 0.8 pf at the rated voltage. Find the receiving end voltage and current...
What tools could AA leaders have used to increase their awareness of internal and external issues?...
What tools could AA leaders have used to increase their awareness of internal and external issues? ???ALASKA AIRLINES: NAVIGATING CHANGE In the autumn of 2007, Alaska Airlines executives adjourned at the end of a long and stressful day in the midst of a multi-day strategic planning session. Most headed outside to relax, unwind and enjoy a bonfire on the shore of Semiahmoo Spit, outside the meeting venue in Blaine, a seaport town in northwest Washington state. Meanwhile, several members of...