Question

when to use a control chart? with a supporting source.

when to use a control chart? with a supporting source.

Homework Answers

Answer #1

The control chart is a graph used to study how a process changes over time. Data are plotted in time order .

When to Use a Control Chart

  • When controlling ongoing processes by finding and correcting problems as they occur.
  • When predicting the expected range of outcomes from a process.
  • When determining whether a process is stable (in statistical control).
  • When analyzing patterns of process variation from special causes (non-routine events) or common causes (built into the process).
  • When determining whether your quality improvement project should aim to prevent specific problems or to make fundamental changes to the process.
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
In making equipment that automatically fills drinks what type of control chart would you use C-chart...
In making equipment that automatically fills drinks what type of control chart would you use C-chart P-chart X-bar-chart R-chart
Which of the following is NOT a type of a control chart? a. R chart b....
Which of the following is NOT a type of a control chart? a. R chart b. p chart c. x-bar chart d. All of these answers are correct.
Determine the fraction of nonconforming product control chart upper limit when the standard given is 0.01...
Determine the fraction of nonconforming product control chart upper limit when the standard given is 0.01 proportion of nonconfroming Determine the Average Run Length (ARL) of a x-bar chart with limits where the process has shifted 0.25 times the standard deviation in one direction
calculate the upper and lower control limits and then construct a control chart. Display your chart....
calculate the upper and lower control limits and then construct a control chart. Display your chart. Question: Using the control chart rules for detecting special causes, can you detect a special cause? Explain why or why not. Week Average Delay Time (in days) 1 34 2 30 3 35 4 32 5 28 6 26 7 29 8 28 9 35 10 26 11 34 12 31 13 28 14 40 15 26 16 32 17 31 18 30 19...
Explain why there is often no “lower control limit” (LCL) on a p-chart (or a c-chart).
Explain why there is often no “lower control limit” (LCL) on a p-chart (or a c-chart).
1) Both X bar chart and R chart must be out of control for the process...
1) Both X bar chart and R chart must be out of control for the process to be out of control true /False 2) A process in control does not produce unacceptable output. true /False 3) A process is capable if the variations fall within +- 3 standard deviation true /False 4) Control charts tell Project Managers how to control the project. true /False
A control chart for fraction nonconforming indicates that the current process average is 0.03. The sample...
A control chart for fraction nonconforming indicates that the current process average is 0.03. The sample size is constant at 200 units. a) Find the three-sigma control limits for the control chart. b) What is the probability that a shift in the process average to 0.08 will be detected on the first subsequent sample? (Hint: use normal approximation) c) What is the probability that this shift will be detected on the second sample taken after the shift?
A process is controlled with a fraction nonconforming control chart with three-sigma limits, ? = 100....
A process is controlled with a fraction nonconforming control chart with three-sigma limits, ? = 100. Suppose that the center line = 0.10. (a) Suppose that the percentage of conforming units in sample ? is ?? . What distribution should ?? follow? Use a Normal distribution to approximate the distribution of ?? . Specify the mean and the variance of this Normal distribution. (b) Find the upper and lower control limit for this fraction nonconforming chart. (c) Find the equivalent...
A process is in control and normally distributed with ? control chart limits of 45 and...
A process is in control and normally distributed with ? control chart limits of 45 and 15. The subgroup size is 4. Suppose the process variance suddenly triples while process mean remains unchanged. What is the probability that the first subsequent subgroup average will fall outside the control limits? What are the ? probability and ARL?
HCH Manufacturing has decided to use a p-Chart with 2-sigma control limits to monitor the proportion...
HCH Manufacturing has decided to use a p-Chart with 2-sigma control limits to monitor the proportion of defective steel bars produced by their production process. The quality control manager randomly samples 250 steel bars at 12 successively selected time periods and counts the number of defective steel bars in the sample. Sample   Defects 1   7 2   10 3   14 4   8 5   9 6   11 7   9 8   9 9   14 10   11 11   7 12   8 Step 1 of...