The control chart is a graph used to study how a process changes over time. Data are plotted in time order .

When to Use a Control Chart

  • When controlling ongoing processes by finding and correcting problems as they occur.
  • When predicting the expected range of outcomes from a process.
  • When determining whether a process is stable (in statistical control).
  • When analyzing patterns of process variation from special causes (non-routine events) or common causes (built into the process).
  • When determining whether your quality improvement project should aim to prevent specific problems or to make fundamental changes to the process.
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
What is the difference between a Pareto chart and a control chart? When should each be...
What is the difference between a Pareto chart and a control chart? When should each be used?
1. When do you use a p chart instead of an np chart? 2. When do...
1. When do you use a p chart instead of an np chart? 2. When do you use a moving average chart instead of an individual’s chart? 3. What does an Acceptable Quality Level of 5% mean? 4. When should you change your control limits (name one thing only)? 5. When you change your process, you may have introduced new sort of _____________ 6. Taguchi says that any deviation from target is ________________ 7. What do you assume when using...
In making equipment that automatically fills drinks what type of control chart would you use C-chart...
In making equipment that automatically fills drinks what type of control chart would you use C-chart P-chart X-bar-chart R-chart
Which of the following is NOT a type of a control chart? a. R chart b....
Which of the following is NOT a type of a control chart? a. R chart b. p chart c. x-bar chart d. All of these answers are correct.
Determine the fraction of nonconforming product control chart upper limit when the standard given is 0.01...
Determine the fraction of nonconforming product control chart upper limit when the standard given is 0.01 proportion of nonconfroming Determine the Average Run Length (ARL) of a x-bar chart with limits where the process has shifted 0.25 times the standard deviation in one direction
calculate the upper and lower control limits and then construct a control chart. Display your chart....
calculate the upper and lower control limits and then construct a control chart. Display your chart. Question: Using the control chart rules for detecting special causes, can you detect a special cause? Explain why or why not. Week Average Delay Time (in days) 1 34 2 30 3 35 4 32 5 28 6 26 7 29 8 28 9 35 10 26 11 34 12 31 13 28 14 40 15 26 16 32 17 31 18 30 19...
Explain why there is often no “lower control limit” (LCL) on a p-chart (or a c-chart).
Explain why there is often no “lower control limit” (LCL) on a p-chart (or a c-chart).
1) Both X bar chart and R chart must be out of control for the process...
1) Both X bar chart and R chart must be out of control for the process to be out of control true /False 2) A process in control does not produce unacceptable output. true /False 3) A process is capable if the variations fall within +- 3 standard deviation true /False 4) Control charts tell Project Managers how to control the project. true /False
What is a control chart? How is it used? What are the benefits of using control...
What is a control chart? How is it used? What are the benefits of using control charts? Describe three fundamental principles regarding the statistical basis of control charts and why these principles are important
A control chart for fraction nonconforming indicates that the current process average is 0.03. The sample...
A control chart for fraction nonconforming indicates that the current process average is 0.03. The sample size is constant at 200 units. a) Find the three-sigma control limits for the control chart. b) What is the probability that a shift in the process average to 0.08 will be detected on the first subsequent sample? (Hint: use normal approximation) c) What is the probability that this shift will be detected on the second sample taken after the shift?
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT