Three loads are connected in parallel across a 1500 Vrms - 60 hz. Load 1 absorbs 23 kW and 14 kVAr capacitive. Load 2 absorbs 70 kVA with power factor 0.7 lagging. Load 3 absorbs 22kW with power factor = 1. Find: a) Complex impedance, seen from power source b) Power Factor of the setup and module of Rms current supplied by the source c) Complex impedance of Load 2 d) Value of capacitor to be connected to the combination to take power factor to 1. e) Value in module of the new current across the combination after the adjust of power factor
Get Answers For Free
Most questions answered within 1 hours.