Question 1: You are an investor who wants to build a power plant that needs 30...

Question 1: You are an investor who wants to build a power plant that needs 30 MW of power. To transmit at 220V, you will need a two-wire line of copper wire using 0.5cm. Assume that the cost of electricity is 25 cents per kW-hour. Could you enter such an investment and explain why?

Homework Answers

Answer #1

We can invest in solar power plant of 30 MW that can be contacted with grid directly or stand alone. Connecting with grid will be more efficient and cost effective it can save the battery cost and also provide better supplement to the existing power supply. Recently there is a reduction in the price of solar PV. Hence it could be a better option as it requires less resource and emission free. Govt will also provide subsidy to such project. The cost of solar panel is 0.5 dollar per watt hour means it requires 500 dollar for 1kwh. And also have very minimal maintenance cost. For such project of 30 MW it will be highly effective.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Suppose that an electricity provider would build a power plant at the cost of $50 million....
Suppose that an electricity provider would build a power plant at the cost of $50 million. Once the plant is built, it would cost the plant $0.07 per kilowatt hour of electricity that it produces. Over its lifetime, the plant is expected to generate 100 million kilowatt hours. Suppose that the regulators believe that the investors who put up capital to build the plant should be able to recoup its investment plus a 300% return throughout the life of the...
B. A regional electric utility currently relies on natural gas for power generation. It has 200...
B. A regional electric utility currently relies on natural gas for power generation. It has 200 Mw of natural gas capacity that is running on an average of 30 percent efficiency. It is studying options for supplying additional power to its customers. It has all of the following options: Coal:   A 50 megawatt (Mw) coal plant with a capital cost of $50 million and operating costs of $5 million per year plus the cost of coal. The coal plant would...
A coal-fired power plant can produce electricity at an operating cost of $0.06 per kilowatt-hour when...
A coal-fired power plant can produce electricity at an operating cost of $0.06 per kilowatt-hour when running at its full capacity of 30 megawatts per hour, $0.16 per kilowatt-hour when running at 20 megawatts per hour, and $0.24 per kilowatt-hour when running at 10 megawatts per hour. A gas-fired power plant can produce electricity at a variable cost of $0.12 per kilowatt-hour at any capacity from 1 megawatt per hour to its full capacity of 5 megawatts per hour. The...
Question 1 Pumped storage reservoirs are a way of    _____   energy, ready to   _____    electricity when we...
Question 1 Pumped storage reservoirs are a way of    _____   energy, ready to   _____    electricity when we need a lot of it in a hurry. When there is a sudden _____ in demand most power stations take a long time to increase their _____ . Whilst we're waiting for them we would have power cuts, possibly with_____ consequences if, for example we lost traffic lights or air traffic control. Pumped storage reservoirs such as the one at   _____in North_____can go from nothing...
Question 1 30 marks You are the manager of Compounders Ltd. The company mixes compound for...
Question 1 30 marks You are the manager of Compounders Ltd. The company mixes compound for smaller plastic extrusion companies. Compounders Ltd has six (6) mixing machines with a maximum capacity (100%) of 250 ton per month. However, due to power cuts, the machines are currently being operated at 75% of installed capacity. One (1) ton of a compound mixture consists of two (2) raw materials: 0.7 ton of Electrolyte and 0.3 ton of Copper Wire. Assume no wastage. There...
Question 1 30 marks You are the manager of Compounders Ltd. The company mixes compound for...
Question 1 30 marks You are the manager of Compounders Ltd. The company mixes compound for smaller plastic extrusion companies. Compounders Ltd has six (6) mixing machines with a maximum capacity (100%) of 250 ton per machine. However, due to power cuts, the machines are currently being operated at 75% of installed capacity. One (1) ton of a compound mixture consists of two (2) raw materials: 0.7 ton of Electrolyte and 0.3 ton of Copper Wire. Assume no wastage. There...
Question 1: (30 marks) You are the manager of Compounders Ltd. The company mixes compound for...
Question 1: You are the manager of Compounders Ltd. The company mixes compound for smaller plastic extrusion companies. Compounders Ltd has six (6) mixing machines with a maximum capacity (100%) of 250 ton per machine. However, due to power cuts, the machines are currently being operated at 75% of installed capacity. One (1) ton of a compound mixture consists of two (2) raw materials: 0.7 ton of Electrolyte and 0.3 ton of Copper Wire. Assume no wastage. There are no...
Please show the formula from excel if you can. Thanks Question 1 : A company has...
Please show the formula from excel if you can. Thanks Question 1 : A company has the opportunity to expand its business operations by acquiring new plant and equipment. The plant and equipment will cost $80,000 and have a useful life of 6 years. At the end of the period the plant and equipment will have a salvage value of $10,000. The Tax Office allows the company to depreciate this equipment at 25% per annum using the prime cost method...
DO NOT RESPOND UNLESS YOU INTEND TO ANSWER EACH QUESTION 1. A university dean is interested...
DO NOT RESPOND UNLESS YOU INTEND TO ANSWER EACH QUESTION 1. A university dean is interested in determining the proportion of students who receive some sort of financial aid. Rather than examine the records for all students, the dean randomly selects 200 students and finds that 118 of them are receiving financial aid. The 95% confidence interval for p is 0.59 ± 0.07. Interpret this interval. a. We are 95% confident that the true proportion of all students receiving financial...
How failing power utility is fuelling South Africa’s economic crisis South Africa’s state power utility Eskom...
How failing power utility is fuelling South Africa’s economic crisis South Africa’s state power utility Eskom is the biggest challenge facing the country. Mess up Eskom, and you mess up the country. In addition, it looks as though key players are doing just that. The past two weeks will be remembered as the start of a cataclysmic economic crisis caused by the failure of three powerful men to spend enough time in a room to find a comprehensive solution that...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT