The cumulative average labor hours to assemble the first five units of product A was 14.541...

The cumulative average labor hours to assemble the first five units of product A was 14.541 hours. If the learning​ curve, based on the previous experience with similar​ products, is 85​%, what is the estimated time​ (labor hours) that will be required to assemble the 22th​ unit?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
4.4 If unit 1 requires 6 labor hours and unit 5 requires 1.8324, what is the...
4.4 If unit 1 requires 6 labor hours and unit 5 requires 1.8324, what is the learning rate? What will unit 6 require? What have the first five units required in total? 4.6 If unit 1 required 200 hours to produce and the labor records for an Air Force contract of 50 units indicate an average labor content of 63.1 hours per unit, what was the learning rate? What total additional number of labor hours would be required for another...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in one of its products. Marshall expected to produce and sell 1,910 units annually. The pilot run required an average of 0.55 direct labor hours per piston for 80 pistons. Marshall experienced an eighty percent learning curve on the direct labor hours needed to produce new pistons. Past experience indicated that learning tends to cease by the time 1,280 pistons are produced. Marshall's manufacturing costs...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in one of its products. Marshall expected to produce and sell 1,950 units annually. The pilot run required an average of 0.55 direct labor hours per piston for 80 pistons. Marshall experienced an ninety percent learning curve on the direct labor hours needed to produce new pistons. Past experience indicated that learning tends to cease by the time 1,280 pistons are produced. Marshall's manufacturing costs...
A small appliance manufacturer has estimated the manufacturing costs of its new product as follows: The...
A small appliance manufacturer has estimated the manufacturing costs of its new product as follows: The company's engineer estimated that the production of the new product has a 70% learning curve applied to labor required, and the time to complete the first unit was 48 labor hours. Assume that the time required to complete the 8th unit is used for cost estimation purposes. If the product is sold for $2413.05 per unit, what is the company’s profit margin (%) for...
Question #1: Wall, Corp. (Wall) is the leading manufacturer of drywall in the United States. Dry,...
Question #1: Wall, Corp. (Wall) is the leading manufacturer of drywall in the United States. Dry, Inc. (Dry) has announced plans to begin selling a new and improved type of drywall starting next year. To maintain their position as the leading manufacturer, and to compete with Dry, Wall decided to start producing an improved type of drywall as well. When the production line started, it took 29 hours to make the first batch of 100 8' by 4' sheets. Wall...
Henderson Equipment Inc. produced a pilot run of 20 units of a recently developed motor used...
Henderson Equipment Inc. produced a pilot run of 20 units of a recently developed motor used in the finished products. The pilot run required an average of 12 direct labor hours per motor. Henderson has an eighty percent learning curve on the direct labor hours needed to produce new motors. Calculate the average direct labor hours per unit for the first 640 motors (including the pilot run) produced.
Learning Curve Analysis Scorpion Manufacturing recently completed and sold an order for 50 unit that had...
Learning Curve Analysis Scorpion Manufacturing recently completed and sold an order for 50 unit that had costs as follows: Direct Materials $1,500 Direct Labor (1,000 hours @ $8.50) $8,500 Variable Overhead (1,000 hours @ $4)* $4,000 Fixed Overhead** $1,400 $15,400 *Applied on the basis of direct labor hours **Applied at the rate of 10% of variable cost. The company has now been requested to prepare a bid for 150 units of the same product. If an 80% learning curve is...
Airon Company recently completed 11,200 units of its single product, consuming 34,000 labor hours that cost...
Airon Company recently completed 11,200 units of its single product, consuming 34,000 labor hours that cost the firm $598,400. According to manufacturing specifications, each unit should have required 3 hours of labor time at $18.00 per hour. On the basis of this information, determine Airon’s labor rate variance and labor efficiency variance. Rate Efficiency A. $13,440F $7,040F B. $13,440F $7,040U C. $13,600F $7,200F D. $13,600F $7,200U E. $13,600U $7,200U
Check my homework: Overhead is applied to products on the basis of direct labor-hours. At the...
Check my homework: Overhead is applied to products on the basis of direct labor-hours. At the beginning of the current year, management estimated that $600,000 in overhead costs would be incurred and the company would produce and sell 1,000 units of the flexible model and 10,000 units of the regular model. The flexible model requires 2 hours of direct labor time per unit, and the regular model requires 1 hour. Direct materials and labor costs per unit are given below:...
Lenoir Company manufactures two products—28,000 units of Product D and 12,000 units of Product R. The...
Lenoir Company manufactures two products—28,000 units of Product D and 12,000 units of Product R. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products D and R: Activity Cost Pool Activity Measure        Estimated Overhead Cost Expected Activity Machining. . . . ....