Question

1) Constraints limit the degree to which the objective can be pushed in linear programming. As...

1) Constraints limit the degree to which the objective can be pushed in linear programming. As a manager, how do you know which constraints are proper to use in your decision model? Describe a basic situation and give an example of a constraint you are able to identify.

2) What role does feasibility play in linear programming, in your opinion?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider the following linear programming model with 4 regular constraints: Maximize 3X + 5Y subject to:...
Consider the following linear programming model with 4 regular constraints: Maximize 3X + 5Y subject to: 4X + 4Y ≤ 48 (constraint #1) 2X + 3Y ≤ 50 (constraint #2) 1X + 2Y ≤ 20 (constraint #3) Y ≥ 2 (constraint #4) X, Y ≥ 0 (non-negativity constraints) (a) Which of the constraints is redundant? Constraint #____. Justify using the data from the above LP model: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ (b) Is solution point (10,5) a feasible solution? _____. Explain using...
Solve the following linear programming model by using the graphical method: graph the constraints and identify...
Solve the following linear programming model by using the graphical method: graph the constraints and identify the feasible region. Using the corner points method, determine the optimal solution (s) (show your work). Maximize Z = 6.5x1 + 10x2 Subject to x1 + x2 ≤ 15 2x1 + 4x2 ≤ 40 x1 ≥ 8 x1, x2 ≥ 0 b. If the constraint x1 ≥ 8 is changed to x1 ≤ 8, what effect does this have on the optimal solution? Are...
a. Solve the following linear programming model by using the graphical method: graph the constraints and...
a. Solve the following linear programming model by using the graphical method: graph the constraints and identify the feasible region then determine the optimal solution (s) (show your work). Minimize Z = 3x1 + 7x2 Subject to 9x1 + 3x2 ≥ 36 4x1 + 5x2 ≥ 40 x1 – x2 ≤ 0 2x1 ≤ 13 x1, x2 ≥ 0 b. Are any constraints binding? If so, which one (s)?
. A manufacturing company produces diesel engines in four factories located in Tucson, Seattle, Baltimore, and...
. A manufacturing company produces diesel engines in four factories located in Tucson, Seattle, Baltimore, and Detroit. Three trucking firms purchase these engines for their plants located in Nashville, Miami, and Charleston. The supplies and demands, along with the per engine transportation costs in dollars are given below:                                                                           Plant                                                               Nashville             Miami         Charleston         Supply              __________________________________________________________________                         Tucson                800               1100                400                  35    Factory            Seattle                 550               950                 600                  35                        ...
FOR MGMT 205 * I DO NOT WANT AN ANSWER THAT TALKS ABOUT TOBACCO OR BONDS**...
FOR MGMT 205 * I DO NOT WANT AN ANSWER THAT TALKS ABOUT TOBACCO OR BONDS** Your problem will have exactly two variables (an X1 and an X2) and will incorporate a maximization (either profit or revenue) objective. You will include at least four constraints (not including the X1 ? 0 and X2 ? 0 [i.e., the “Non-negativity” or “Duh!”] constraints). At least one of these four must be a “?” constraint, and at least one other must be a...
Define project. Define the term project objective, and give some examples. List some examples of resources...
Define project. Define the term project objective, and give some examples. List some examples of resources that are used on a project. What role does a customer have during the project life cycle? Why is it important to satisfy the customer? What aspects of a project might involve some degree of uncertainty? Why? Define scope, schedule, cost, and customer satisfaction. Why are these considered to be constraints? List and describe the main phases of the project life cycle. List and...
Consider the following linear programming formulation: Min      Z = X 1 + X 2 Subject to...
Consider the following linear programming formulation: Min      Z = X 1 + X 2 Subject to X 1 + X 2 ≥ 3 X 1 + X 2 ≥ 5 X 1, X 2 ≥ 0 Identify the feasible region in the graph below. Only one constraint will be shifted at a time. Which shift will produce an increase of the current feasible area? YOUR ANSWER CORRECT ANSWER X 1 + X 2 ≥ 3 shifts to X 1 +...
Linear Programming Formulation Project IE-311 Operation Research I Western Bank of Commerce and Industry (WBCI) is...
Linear Programming Formulation Project IE-311 Operation Research I Western Bank of Commerce and Industry (WBCI) is a busy bank that has requirements for between 10 and 18 tellers, depending on the time of the day. The afternoon time, from noon to 2 P.M., is usually heaviest. The table below indicates the workers needed at various hours that the bank is open: Time Period Number Required 9 A.M - 10 A.M 10 10 A.M. – 11 A.M. 12 11 A.M. –...
Answer Questions 2 and 3 based on the following LP problem. Let     P1 = number of...
Answer Questions 2 and 3 based on the following LP problem. Let     P1 = number of Product 1 to be produced           P2 = number of Product 2 to be produced           P3 = number of Product 3 to be produced Maximize 100P1 + 120P2 + 90P3         Total profit Subject to         8P1 + 12P2 + 10P3 ≤ 7280       Production budget constraint             4P1 + 3P2 + 2P3 ≤ 1920       Labor hours constraint                                    P1 > 200         Minimum quantity needed...
Part 2: Blair & Rosen, Inc. (B&R) is a brokerage firm that specializes in investment portfolios...
Part 2: Blair & Rosen, Inc. (B&R) is a brokerage firm that specializes in investment portfolios designed to meet the specific risk tolerances of its clients. A client who contacted B&R this past week has a maximum of $50,000 to invest. B&R's investment advisor decides to recommend a portfolio consisting of two investment funds: an Internet fund and a Blue Chip fund. The Internet fund has a projected annual return of 12%, while the Blue Chip fund has a projected...