Question

Harriet is trying to determine how many units of two types of lawn mowers to produce...

Harriet is trying to determine how many units of two types of lawn mowers to produce each day. One of these is the Standard model, while the other is the Deluxe model. The profit per unit on the Standard model is $60, while the profit per unit on the Deluxe model is $40. The Standard model requires 20 minutes of assembly time, while the Deluxe model requires 35 minutes of assembly time. The Standard model requires 10 minutes of inspection time, while the Deluxe model requires 15 minutes of inspection time. The company must fill an order for 6 Deluxe models. There are 450 minutes of assembly time and 180 minutes of inspection time available each day. How many units of each product should be manufactured to maximize profits? Show all of your work and provide evidence that you can set up and solve a linear programming (LP) problem. Clearly identify your answer(s) and provide a brief discussion of the results. You may use the POM (preferred and easier) software or another software to complete this problem. Submit your results from the software in an Excel file and answer each of the questions below in that file. QUESTIONS: a. Formulate and solve the problem as a linear programming problem b. Are the two resources (assembly time and inspection time) fully used? If so, which one(s)? c. If a resource is not fully used, how much of it is unused? d. Over what range of prices for the Standard model would the solution you obtained remain the same. To answer this question you could use the ranging window in POM. e. If you could obtain one more unit of the assembly time or inspection time how much would you be willing to pay for that additional resource?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1 2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $90 per unit and the profit on the economy...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1/2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $94 per unit and the profit on the economy model...
Deegan Industries manufactures two types of roll bars for Porsches. Model DRB is bolted to the...
Deegan Industries manufactures two types of roll bars for Porsches. Model DRB is bolted to the car using existing hotels in the car's frame. Model DRW is a heavier roll bar that must be welded to the cars frame. Model DRB requires 20 pounds of a special high alloy steel, 40 minutes of manufacturing time, and 60 minutes of assembly time. Model DRW requires 25 pounds of the special high alloy steel, 100 minutes of manufacturing time, and 40 minutes...
. A sport goods company wants to determine the number of All-Pro and College footballs to...
. A sport goods company wants to determine the number of All-Pro and College footballs to produce in order to maximize profit. Constraints affecting the production quantities are the production capacities in three departments: cutting and dyeing; sewing; and inspection and packaging. There are 550 hours of cutting and dyeing time, 400 hours of sewing time, and 150 hours of inspection and packaging time available. Each All-Pro football requires 15 minutes of cutting and dyeing time, 10 minutes of sewing...
A computer company manufactures two types of computers. Each type of computer will require assembly time,...
A computer company manufactures two types of computers. Each type of computer will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the computers is limited. The manager wants to determine the quantity of each computer to produce to maximize the profit generated by sales of these computers. In order to develop a suitable model of the problem, the manager has met with design and manufacturing...
A) Perth Mining Company operates two mines for the purpose of extracting gold and silver. The...
A) Perth Mining Company operates two mines for the purpose of extracting gold and silver. The Saddle Mine costs $16,000/day to operate, and it yields 60 oz of gold and 3000 oz of silver each of x days. The Horseshoe Mine costs $18,000/day to operate, and it yields 80 oz of gold and 1250 oz of silver each of y days. Company management has set a target of at least 700 oz of gold and 17,000 oz of silver. How...
Sun Systems makes two types of retractable awnings - Premium and Deluxe. Each Premium unit produced...
Sun Systems makes two types of retractable awnings - Premium and Deluxe. Each Premium unit produced requires 50 minutes processing on Machine 1 and 30 minutes processing on Machine 2. Each Deluxe unit produced requires 25 minutes processing on Machine 1 and 30 minutes processing on Machine 2. At the start of the current week there are 25 Premium units and 40 Deluxe units in stock. Machine 1 has 20 hours of processing time available during the current week and...
An automobile paint manufacturer produces two types of product, Paint X of standard quality and Paint...
An automobile paint manufacturer produces two types of product, Paint X of standard quality and Paint Y of high quality. There are two components required in making these products: the filler and the special pigment. Paint X requires 2 units of filler and 3 units of special pigment for each unit made, and is sold at a profit RM 1.00 per unit. Paint Y requires 4 units of filler and 2 units of special pigment for each unit made, and...
A manufacturing plant produces two types of widgets: standard model; deluxe model. Each unit requires the...
A manufacturing plant produces two types of widgets: standard model; deluxe model. Each unit requires the use of direct labor and labor time per unit differs between models. Manufacturing is done in production runs and each run has a set-up. For the month, the plant recorded the following: Standard Deluxe 2,000 1,000 Units produced $20,000 $30,000 Direct labor costs 4 12 Number of production runs Consider the salaries of production supervisors ($90,000). How much of this cost should be assigned...
A company produces a certain product and has the capacity to produce 100 units per month...
A company produces a certain product and has the capacity to produce 100 units per month in regular time, and an additional 15 units per month in overtime. The production cost of the product varies by month due to changes in the material costs over time. The quantities of the product to be delivered over the next six months have already been set. The delivery requirements and production costs are given in the following table: Month 1 2 3 4...