Question

Type or paste question here Two incinerators are being considered by a waste management company. Design...

Type or paste question here

Two incinerators are being considered by a waste management company. Design A has an initial cost of $2,825,000, has annual operating and maintenance costs of $950,000, and requires overhauls every 5 years at a cost of $1,325,000. Design B is more sophisticated, including computer controls; it has an initial cost of $5,750,000, has annual operating and maintenance costs of $650,000, and requires overhauls every 10 years at a cost of $2,750,000.

Click here to access the TVM Factor Table Calculator

Using a 9.0 %/year interest rate, determine the capitalized cost for each design.

Design A: $
Design B: $

Carry all interim calculations to 5 decimal places and then round your final answer to the nearest dollar. The tolerance is ±400.
Recommend which design should be chosen:
Design A
Design B

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A waste management company is considering the purchase of an incinerator. One of the designs considered...
A waste management company is considering the purchase of an incinerator. One of the designs considered has an initial cost of $2.5 M, has annual operating and maintenance costs of $800,000 and requires overhauls every 5 years at a cost of $1,250,000. The estimated life of the incinerator is 15 years and salvage value of $100,000. Please identify the costs involved in this problem and classified each according to the categories discussed in class. Show the cashflow diagram associated with...
A bridge design firm is performing an economic analysis of two mutually exclusive designs for a...
A bridge design firm is performing an economic analysis of two mutually exclusive designs for a highway overpass. The steel girder option has an initial cost of $2.04 million, and the concrete option has an initial cost of $2.52 million. Every 25 years, the steel bridge must be painted at a cost of $790,000, and all other maintenance costs are the same for both options. The steel bridge is expected to last 50 years, and concrete bridge is expected to...
Sign In INNOVATION Deep Change: How Operational Innovation Can Transform Your Company by Michael Hammer From...
Sign In INNOVATION Deep Change: How Operational Innovation Can Transform Your Company by Michael Hammer From the April 2004 Issue Save Share 8.95 In 1991, Progressive Insurance, an automobile insurer based in Mayfield Village, Ohio, had approximately $1.3 billion in sales. By 2002, that figure had grown to $9.5 billion. What fashionable strategies did Progressive employ to achieve sevenfold growth in just over a decade? Was it positioned in a high-growth industry? Hardly. Auto insurance is a mature, 100-year-old industry...