Question

If there is no toll on the highway at any time, then there will be of...

If there is no toll on the highway at any time, then there will be of highway space during off-peak hours and of highway space during rush hour.

Homework Answers

Answer #1

If there is no toll on the highway at any time, then there will be surplus of highway space during off-peak hours and shortage of highway space during rush hour.

Explanation: Generally, a toll is charged on automobiles in the rush hours and no toll is charged on off-peak hours in order to reduce the number of vehicles in the rush hours and increase the number of vehicles on road in the off-peak hours. A toll on rush hour is intended to create an economic incentive for people to drive more on off-peak hours. In the absence of toll, there will be a shortage of road space in rush hours and a surplus of road space in off-peak hours.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A convertible and a minivan leave a highway junction at the same time. The convertible travels...
A convertible and a minivan leave a highway junction at the same time. The convertible travels west at 60 miles per hour and the minivan travels north at 50 miles per hour. Assuming the two vehicles do not deviate off course, how far apart are they after 4 hours? Distance Apart =
The current toll for the use of a certain toll road is $1.50. A study conducted...
The current toll for the use of a certain toll road is $1.50. A study conducted by the state highway department determined that with a toll of p dollars, q cars will use the road each day, where q = 60,000e^-0.5p Find an expression for the Elasticity of Demand, E(p) Is the demand Elastic or Inelastic at the current toll price?    If the state increases the toll slightly, will the revenue increase of decrease? Should they consider raising the...
The current toll for the use of a certain toll road is $50. A study conducted...
The current toll for the use of a certain toll road is $50. A study conducted by the state highway department determined that with a toll of p dollars, q cars will use the road each day, where q = 60,000e^-0.5p Find an expression for the Elasticity of Demand, E(p) [4] Is the demand Elastic or Inelastic at the current toll price?                     [2] If the state increases the toll slightly, will the revenue increase of decrease?                                                                                                                        [1] Should they consider raising the...
A 4-mile stretch of highway on one place averages about 55,000 cars during rush hour. The...
A 4-mile stretch of highway on one place averages about 55,000 cars during rush hour. The average driver has an accident every 165,000 miles. Now, suppose I drive the route to work during rush hour and each accident in that portion of the highway slows me down by 10 min. There is a rule at work: $5 if you are at work at time, pay $10 if you're 10 minutes late, and pay $40 if you're 20min late or more....
A sales firm receives on average three calls per hour on its toll-free number. For any...
A sales firm receives on average three calls per hour on its toll-free number. For any given hour, find the probability that it will receive the following: at most 3 calls. at least 3 calls. five or more calls. between 1 and 4 calls in 2 hours. Find the average number of calls. Find the standard deviation of number of calls.
The Interboro Rapid Transit Authority (IRTA) has estimated the following peak and off-peak demand equations for...
The Interboro Rapid Transit Authority (IRTA) has estimated the following peak and off-peak demand equations for its commuter rail service: QP=50-2P QOP=20-4POP Where Q is measured in thousands of passenger miles. IRTA’s marginal cost of providing commuter rail service is constant at $3 per passenger mile. IRTA’s capacity is 20 thousand passenger miles, which it reaches during peak, rush hours. What fare should IRTA change during peak and off-peak hours?
Q1. Suppose the government is considering an increase in the toll on a certain stretch of...
Q1. Suppose the government is considering an increase in the toll on a certain stretch of highway from $3 to $4. At present, 1 million cars per week use that highway stretch; after the toll is imposed, the number of cars per week will change according to its price elasticity of demand of -0.8 (this elasticity value is estimated based on the initial-value method). If the marginal cost of highway use is constant (i.e., the supply curve is horizontal) and...
At some restaurants, patrons who use wifi are asked to limit their laptop time during peak...
At some restaurants, patrons who use wifi are asked to limit their laptop time during peak lunch hours. Most of the day, everyone is welcome to wifi time and a table. It seems as if these restaurants recognize that table space and wifi access during peak times can be: a. a private approach to taxing externalities b. a quasi public good c. a common resource d. a. public good
A problem in many metropolitan areas is traffic congestion. a. In what way is this an...
A problem in many metropolitan areas is traffic congestion. a. In what way is this an externality? (Don't have to answer this one, I know it) b. How might you determine the externality by me driving my car? (Don't have to answer this one, I know it) c. Suppose that for every car that enters the road during rush hour: All of the other 10,000 cars on the highway have their trips slowed by 1/100 a second; the cost of...
A vehicle queue is formed at an entrance to the toll plaza due to a malfunction...
A vehicle queue is formed at an entrance to the toll plaza due to a malfunction of one of the toll booths. The malfunction is corrected after 30 minutes, at which time all the toll booths are fully operational. The following is known about the traffic and service rate at the toll plaza: Demand (vehicle arrival rate), constant during the entire time = 29 veh/min Normal toll processing rate (vehicle departure rate) = 34 veh/min Toll processing rate (vehicle departure...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT