Question

. Jones Furniture Company produces beds and desks for college students. The production process requires carpentry...

. Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited so at most 8 will be produced. After solve the problem using the graphical method, the number of desks to produce that maximizes the objective function is:
a. 1
b. 2
c. 3
d. 4

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
❑A furniture Company produces tables and chairs. Each table takes four hours of labor from the...
❑A furniture Company produces tables and chairs. Each table takes four hours of labor from the carpentry department and two hours of labor from the finishing department. Each chair requires three hours of carpentry and one hour of finishing. During the current week, 260 hours of carpentry time are available and 120 hours of finishing time. Each table produced gives a profit of $60 and each chair a profit of $40. How many chairs and tables should be made? 1....
Part 3 – Steelcase Production Steelcase Corporation manufactures 3 basic products: chairs, desks, and tables. Below...
Part 3 – Steelcase Production Steelcase Corporation manufactures 3 basic products: chairs, desks, and tables. Below is chart which summarizes the number of labor hours spent for each product in each division. Chairs Desks Tables Process Carpentry 2 3 6 Finishing 1 1 1 Assembly 4 6 2 In a given week, Steelcase has 250 hours available for carpentry, 100 hours available for finishing, and 400 hours available for assembly. Steelcase makes a profit of $66 on each chair, $75...
The Electric Company produces generators and alternators for industrial purposes. Each generator requires 3 hours of...
The Electric Company produces generators and alternators for industrial purposes. Each generator requires 3 hours of wiring and 2 hours of testing. Each alternator requires 2 hours of wiring and 4 hours of testing. There are 18 hours of wiring time and 20 hours of testing time available. Generators earn $15 of profit per unit and alternators earn $20 of profit per unit. What is the objective function?
A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours...
A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective is...
A division of the Winston Furniture Company manufactures dining tables and chairs. Each table requires 40...
A division of the Winston Furniture Company manufactures dining tables and chairs. Each table requires 40 board feet of wood and 3 labor-hours. Each chair requires 16 board feet of wood and 4 labor-hours. The profit for each table is $40, and the profit for each chair is $30. In a certain week, the company has 3200 board feet of wood available and 520 labor-hours available. How many tables and chairs should Winston manufacture to maximize its profit? (Let x...
A small company produces three computer components. Component A requires 2 hours of fabrication and one...
A small company produces three computer components. Component A requires 2 hours of fabrication and one hour of assembly, Component B requires 3 hours of fabrication and one hour of assembly, and Component C requires 2 hours of fabrication and 2 hours of assembly. The company has 1000 hours of fabrication and 800 hours of assembly available every week. Profit of Components A, B, and C are $7, $8, and $10 respectively. Using the simplex method, calculate how many components...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1/2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $94 per unit and the profit on the economy model...
A manufacturer produces two products, P and Q, which when sold earn contributions of  £600 and  £400 per...
A manufacturer produces two products, P and Q, which when sold earn contributions of  £600 and  £400 per unit respectively.  The manufacturer of each product requires time on a lathe and a polishing machine. Each unit of P requires 2 hours on the lathe and 1 hour on the polishing machine, while Q requires 1 hour on each machine.  Each day, 10 hours are available on the lathe and 7 hours on the polishing machine.  Determine the number of units of P and Q that...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1 2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $90 per unit and the profit on the economy...
1. A firm produces four products: Each unit of product 1 requires two hours of assembly,...
1. A firm produces four products: Each unit of product 1 requires two hours of assembly, one hour of painting and $50 of inventory, Each unit of product 2 requires one hour of assembly, three hours of painting and $75 of inventory, Each unit of product 3 requires 2.5 hours of assembly, 2.5 hours of painting and $20 of inventory, Each unit of product 4 requires 5 hours of assembly no painting and $100 of inventory. The firm has 140...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT