Minnesota transportation department will be widening a one-lane road into a two-lane freeway in the summer. The project requires the purchase of $21m worth of land for the additional lane. if the department uses an interest rate of 6%, what is the EAC of the right of way? Assume perpetual life since right of way do not wear out
We have the following information
Cost of the land = $21,000,000
Interest rate (i) = 6% per annum or 0.06
Life = perpetual, so we take it to be 100
Equivalent annual cost of the project = 21,000,000(A/P, i, n)
Equivalent annual cost of the project = 21,000,000(A/P, 6%, 100)
Equivalent annual cost of the project = 21,000,000[0.06(1 + 0.06)100/((1 + 0.06)100 – 1)]
Equivalent annual cost of the project = 21,000,000 × 0.0602
Equivalent annual cost of the project = $1,264,200