  1. The Implementation phase of the SDLC is?
    1. Exactly how it should be used
    2. How the systems are built
    3. How it should be installed
    4. How it should be installed
    5. It is never as easy as the textbook says it is.
  2. There are many ways to say what Systems Analysis and Design (SAD) is, but one way is to describe it as?
    1. A method to solve problems and deliver solution sets
    2. Four phases of thought to include planning, Analysis, Design and Implementation
    3. How to transform an idea into reality
    4. A step by step process of solution-based thinking
    5. There is no one way to describe it
    6. Problem solving by solving problems
    7. All of the above
    8. None of the above
    9. I have no clue
  3. Your professor (me) is on favor of one particular method of process design known as?
    1. Prototyping
    2. Throw away prototyping
    3. Early stage prototyping
    4. Date and time stamped prototyping
    5. Any and all of the above because they are all the same. (and not all in the book)
  4. Feasibility Analysis allows us to determine what aspect of a SAD project?
    1. Can we do it
    2. Who will do it?
    3. How will we do it
    4. Alternative existence development in AI neural links
  5. What characteristic(s) a system must have is called a?
    1. Specification
    2. Requirement
    3. Functional Design
    4. Non-functional design

Homework Answers

Answer #1

1)The implementation of the Software Developement Life cycle is (How the systems are built)

This is the phase where we keep all our plans into an action.This is quite dependable on how we built the systems then only we can produce the deliverables.

2)In common terms system analysis and design means combines tech,people and data to business support which is known as a method to get some process done.

In this question I think A method to solve problems and deliver solution sets is a better way to explain it.

3)e

each prototype is important.

4)Feasible analysis allows us to determine How will we do it because it doesn't depend on who is doing or what are they doing? It will be completely dependent on how we understand and how we did it.

5)Functional design is very important in the system.Structure of a system is very much important than specification,requirement & non-functional design.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The output of the detailed design phase of the systems development life cycle (SDLC) is a...
The output of the detailed design phase of the systems development life cycle (SDLC) is a A. fully documented system report B. systems selection report C. detailed design report D. systems analysis report Which statement is not true? A systems design walkthrough A. is conducted by a quality assurance group B. occurs just after system implementation C. simulates the operation of the system in order to uncover errors and omissions D. reduces costs by reducing the amount of reprogramming The...
4A.     Name the one phase of the SDLC in which the users are typically not involved...
4A.     Name the one phase of the SDLC in which the users are typically not involved at all.             ANS:   ___________ 4B.      Name the SDLC phase which has the longest duration.             ANS: ____________ 4C.      Name the phase of the SDLC in which the Functional Specifications/Business Requirements are determined and documented.             ANS:   ___________ 5.         Name three items typically found in a software project plan – that is – three of the column headings.             A. B. C. 6.          _____________...
Systems Development Life Cycle (SDLC), also called The Waterfall Model, to implement the rollout of a...
Systems Development Life Cycle (SDLC), also called The Waterfall Model, to implement the rollout of a software package. As a manager, it important to understand the implications of how a software package is selected, purchased, and installed as it may affect your involvement in the various phases of the system development life cycle. However, most healthcare organizations primarily purchase software from a vendor, this is known as a vendor package. Grey Memorial Hospital is one of those organizations. The appointment...
43) In the process of preparing a receiving report, the receiving department should perform all of...
43) In the process of preparing a receiving report, the receiving department should perform all of the following tasks except: (2pts) compare the completed receiving report to the information stored in the purchase order master data inspect and approve quality count the quantity received compare the vendor’s packing slip to a copy of the purchase requisition 44) Which of the following data stores is updated for job specifications? (2pts) termination data skills inventory data labor-force planning data payroll data All...
In the prior unit, systems planning, you prepared a feasibility study and proposed a broad solution...
In the prior unit, systems planning, you prepared a feasibility study and proposed a broad solution to problems you identified. In the systems analysis phase you will develop a model of your proposed system. This phase applies modeling techniques such as requirements modeling, data and process modeling, and object modeling. The goal of this step is to build a solid foundation for the design phase of the project. For this project, you will prepare a System Requirements document using MS...
The title of the course is SYSTEM ANALYSIS AND DESIGN. All answers should be based on...
The title of the course is SYSTEM ANALYSIS AND DESIGN. All answers should be based on that. Please do not copy and paste answers on chegg or on google for me. All answers should be based on your understanding on the course. Please try as much to answer the questions based on what is asked and not setting your own questions and answering them. Let it be if you want to copy and paste answers. ********************************************************************************************************************************************************************************************************************** 10. (a). You are...
find an example of an organization that introduced new technology and systems in order to effectuate...
find an example of an organization that introduced new technology and systems in order to effectuate changes in business processes, enhancements, and productivity gains (answer as many questions as you can): (1) What set of business problems was the organization trying to address? (2) How did the organization go about assessing the information requirements of the new system? What level of involvement, if any, did the end users have in the development of the new system? (3) What solution did...
HASBRO DEVELOPS A GLOBAL SYSTEMS STRATEGY If you’ve ever played in a sandbox with a Tonka...
HASBRO DEVELOPS A GLOBAL SYSTEMS STRATEGY If you’ve ever played in a sandbox with a Tonka dump truck, accessorized a My Little Pony, manipulated a Transformer, or engaged in mock combat with a G.I. Joe, you have experienced a piece of the Hasbro Inc. juggernaut. Begun by brothers Henry, Hilal, and Herman Hassenfeld in 1923 as a pencil box and school supplies company, Hasbro transitioned to toys in the 1940s. Acquisitions, including Milton Bradley, Tonka, and Wizards of the Coast...
Controlit, Inc’s Information Systems Dept. considered itself to be a proactive company and perform preventative maintenance...
Controlit, Inc’s Information Systems Dept. considered itself to be a proactive company and perform preventative maintenance to it’s computer hardware. Such as blowing out the dust and cleaning the hardware regularly. This is considered: Routine maintenance Non-routine maintenance Hardware management General maintenance Controlit Inc considers itself to be in the front running for having and effective and efficient Information Systems Department. As such they pride themselves on having one of the best end user response times. This can only be...
1. Most database applications require a host programming language to communicate with the database using SQL....
1. Most database applications require a host programming language to communicate with the database using SQL. A wide range of programming languages can be used with SQL,from traditional languages such as COBOL, FORTRAN, and Assembler to more modern languages such as C/C++, Java, and Visual Basic. Your choice of host programming language can impact the way you will have to code SQL. True or False? 2. It is an entity name guideline: a. Do not pluralize the name; use singular...