Question

One of the components of Design by Contract is the invariants. The following function copies one...

One of the components of Design by Contract is the invariants. The following function copies one array to another. What is invariant in this function?

please be quick. i dont have enough time

thanks

Homework Answers

Answer #1

Please upvote if you are able to understand this and if there is any query do mention it in the comment section.

In this function, the array which is being copied to the other array is the invariant as it is not changing and invariant is the one which is not changing and even if the change has to be made then it can be made to the array which was copied.

If some more information is required in this or this is still unclear then please mention it in the comment section otherwise please upvote.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Design ONE FUNCTION in a C++ code to find minimum, maximum and average of items in...
Design ONE FUNCTION in a C++ code to find minimum, maximum and average of items in an array, then place them proper locations in the array. Follow these steps: 1. Create an array with 11 integers, which will be randomly selected from the range of 10 to 100. Only random numbers between 10 and 100 are allowed in the array. Print the items of the array on screen as one line. 2. Develop a function that takes the array as...
Eureka Design Bhd entered into a contract to deliver one of its fixtures and fittings to...
Eureka Design Bhd entered into a contract to deliver one of its fixtures and fittings to Creative Landscaping Bhd on 1st July 2020. The contract requires Creative Landscaping to pay the contract price of $30,000 in advance on 15th July 2020. Creative pays Eureka on 15th July 2020 and Eureka delivers the fixtures and fittings (with cost of $19,000) on 31st July 2020. Required: i) Prepare the journal entry on 1st July 2020 for Eureka Design Bhd. ii) Prepare the...
Components of a certain type are shipped to a supplier in batches of ten. Suppose that...
Components of a certain type are shipped to a supplier in batches of ten. Suppose that 79% of all such batches contain no defective components, 15% contain one defective component, and 6% contain two defective components. Two components from a batch are randomly selected and tested. What are the probabilities associated with 0, 1, and 2 defective components being in the batch under each of the following conditions? One of the two tested components is defective. 2 ___________ Show all...
Lottery Number generator page 335 #2. Design a program that generates a 7 digit lottery number....
Lottery Number generator page 335 #2. Design a program that generates a 7 digit lottery number. The program should have an Integer array with 7 elements. Write a loop that steps through the array, randomly generating a number in the range of 0 through 9. Use the random number generator function. Then write another loop that displays the contents of the array. Create a flowchart using FLOWGORITHM. Please provide screen shot of flowchart using ONLY FLOWGORITHM and a sample output.
Which of the following is NOT one of the components of the policy cycle discussed in...
Which of the following is NOT one of the components of the policy cycle discussed in the textbook? judicial challenges None of the other options are correct; they are all components of the policy cycle legislative decision-making and building of policy support policy design
1.One of the two copies of the globin gene in a fertilized egg cell develops the...
1.One of the two copies of the globin gene in a fertilized egg cell develops the mutation that results in Sickle Cell Anemia. How many copies of this version of the gene will each of the cells in the adult have? a. none b. one c. two d. three 2.What effect would a defective DNA Polymerase I have on the rate of production of Okazaki fragments? a. increase b. decrease c. no effect
Johan, a quality control engineer at ABC Engineering, has a problem. ABC had won the contract...
Johan, a quality control engineer at ABC Engineering, has a problem. ABC had won the contract with USAWAY to supply a product subject to the requirement that all parts are made in the USA. Although the original design clearly specifies that all parts must satisfy this requirement, one of ABC's suppliers failed to note that one of the components has two special bolts that are made only in another country. There is not enough time to design a new bolt...
1.) McMillin Assembly has a contract to assemble components for radar systems to be used by...
1.) McMillin Assembly has a contract to assemble components for radar systems to be used by the U.S. military. The time required to complete one part of the assembly is thought to be normally distributed, with a mean equal to 30 hours and a standard deviation equal to 4.7 hours. In order to keep the assembly flow moving on schedule, this assembly step needs to be completed in 26 to 35 hours. Determine the probability of this happening. Please answer...
1. contract may facilitate exchange when which of the following is true? a. one party is...
1. contract may facilitate exchange when which of the following is true? a. one party is monopolist so there's no perfect competition b. exchange is deferred c. no transaction cost d. none 4. Suppose one party to a contract breaches the contract due to particular contingency but the contract is silent as to which party should bear the risk of that contingency. Econ efficiency suggests which party should bear the risk? a. breaching party b. non-breaching party c. whichever party...
Case study1 Teloxy Engineering has received a onetime contract to design and build 10,000 units of...
Case study1 Teloxy Engineering has received a onetime contract to design and build 10,000 units of a new product. During the proposal process, management felt that the new product could be designed and manufactured at a low cost. One of the ingredients necessary to build the product was a small component that could be purchased for $60 in the marketplace, including quantity discounts. Accordingly, management budgeted $650,000 for the purchasing and handling of 10,000 components plus scrap. During the design...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT