A house is built by 20 workers in 30 days. How many workers will be needed...

A house is built by 20 workers in 30 days. How many workers will be needed to complete the work in 15 days?

Homework Answers

Answer #1

Hi,

Given,

20 worker complete work in 30 days. If same amount of work is to be completed in 15 days then how many worker we need?.

Total amount of work done by 20 workers in 30 days = 20*30 = 600 units.

So,

Same 600 units of work needs to be completed in 15 days by n number of worker.

Let n number of workers required to complete 600 unit of work in 15 days.

Total work done in this case = n*15 units.

As the same work is completed so,

n*15 = 600

n = 600/15

n= 40

Hence 40 workers are needed to complete the job 15 days.

kindly rate.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
How many ml of 20% solution and how many ml of sterile water are needed to...
How many ml of 20% solution and how many ml of sterile water are needed to prepare 500 ml of 2% solution?
According to a travel​ website, workers in a certain country lead the world in vacation​ days,...
According to a travel​ website, workers in a certain country lead the world in vacation​ days, averaging 27.18 days per year. The following data show the number of paid vacation days for a random sample of 20 workers from this country. Complete parts a through c below. 2 4 3 5 19 18 25 23 20 31 22 29 25 22 35 35 33 28 35 64 a. Construct a 95​% confidence interval to estimate the average number of paid...
According to a travel​ website, workers in a certain country lead the world in vacation​ days,...
According to a travel​ website, workers in a certain country lead the world in vacation​ days, averaging 23.12 days per year. The following data show the number of paid vacation days for a random sample of 20 workers from this country. Complete parts a through c below. 8 10 3 4 13 25 22 27 20 29 18 29 20 18 25 31 27 26 43 65 a. Construct a 99​% confidence interval to estimate the average number of paid...
a company wants to estimate the holiday days of its 400 workers. they took a randome...
a company wants to estimate the holiday days of its 400 workers. they took a randome sample of 25 workers (giving 95% confidence interval of 8.1+- 3). now,the 95% confidence interval for the holidays days of workers is 3,240 +- ? (how much: 1200 or 60 or 15)
Using the 30/360 day count convention, how many days are there from March 1, 2016 to...
Using the 30/360 day count convention, how many days are there from March 1, 2016 to April 10, 2016? I thought it would be 39 days, but someone else thinks it should be 40 days. Which is it?
Contractor has 3cy and 5 cy shovel; excavate 50,000 bcy of hard clay in 30 days...
Contractor has 3cy and 5 cy shovel; excavate 50,000 bcy of hard clay in 30 days of 8 hours each. average height is 9 feet, angle of swing is 70 degrees; 3 cy maximum digging is 20 feet; 5 cy maximum is 30 ft. efficiency factor is 30 min hour. How many days to complete the job?
If a 1,200 m bridge is built at a temperature of 21C, how many meters must...
If a 1,200 m bridge is built at a temperature of 21C, how many meters must be allowed for thermal contraction if the temperature might reach -15 C? alpha = 11 10-6 1/C Show with diagram A. 0.175   B. 0.29 C. 0.475 D. 0.524 E. 1.42
Suppose the average size of a new house built in a certain county in 2006 was...
Suppose the average size of a new house built in a certain county in 2006 was 2,271 square feet. A random sample of 30 new homes built in this county was selected in 2010. The average square footage was 2,187​, with a sample standard deviation of 220 square feet. a. Using alphaαequals=0.10​, does this sample provide enough evidence to conclude that the average house size of a new home in the county has changed since​ 2006? b. Use technology to...
Among workers who left, 30% were dissatisfied with salary. 20% left because of work assignments. 12%...
Among workers who left, 30% were dissatisfied with salary. 20% left because of work assignments. 12% indicated dissatisfaction with both (their salary and work assignments). Find the probability that a worker left because of either salary or work assignment issue a. 0.5 b. 0.88 c. 0.12 d. 0.38
Assuming complete dissociation, how many mmol and how many mOsmol (both nearest tenth if needed) of...
Assuming complete dissociation, how many mmol and how many mOsmol (both nearest tenth if needed) of sodium bicarbonate (NaHCO3; MW = 84) are contained in 50 mL of a 12.6% w/v solution? Include units in the box, insert a space between the number and the units to receive credit.
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT