Question

An inode based file system uses 4 Kbyte blocks and 4-byte block numbers. What is the...

An inode based file system uses 4 Kbyte blocks and 4-byte block numbers. What is the largest file size that the file system can handle if an inode has 12 direct blocks, 1 indirect block, and 1 double indirect block?

  1. Approximately 4 GB.
  2. Approximately 16 G.
  3. Approximately 64 MB.
  4. Approximately 1 GB.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
In a hypothetical system with 1024 bytes of main memory, 128 bytes of cache, blocks of...
In a hypothetical system with 1024 bytes of main memory, 128 bytes of cache, blocks of 32-byte size, with direct-map (S = 1) placement policy and LRU replacement policy, answer each of the following questions: Determine the address fields for index, tag and block offset in the memory address. How many sets are there in the cache? How many blocks in the main memory are mapped to the same set of blocks in cache? If associative (parallel) comparison is to...
Matlab uses IEEE double precision numbers: 64-bit floating point representation 1 bit : sign 11 bits:...
Matlab uses IEEE double precision numbers: 64-bit floating point representation 1 bit : sign 11 bits: exponent 52 bits: mantissa. Calculate largest number that can be stored accurately Calculate smallest number (x>0) that can be stored accurately Calculate the machine epsilon Show all work step by step and explain calculations Now calculate the largest number and smallest number for a 10 bit floating point (1 bit for the sign, 4 bits exponent and 5 bits mantissa)
Matlab uses IEEE double precision numbers: 64-bit floating point representation 1 bit : sign 11 bits:...
Matlab uses IEEE double precision numbers: 64-bit floating point representation 1 bit : sign 11 bits: exponent 52 bits: mantissa. Calculate largest number (less than inf) that can be stored accurately Calculate smallest number (x>0) that can be stored accurately Calculate the machine epsilon Show all work step by step and repeat for 10 bit floating point (bit sign, 4 bits exponent and 5 bits mantissa)
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $195,940. Estimated direct labor cost was $465,600 for 19,400 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,940 hours) $ 46,561 Indirect costs Indirect labor 2,530 Indirect materials 3,360 Factory rent 3,230 Factory supervision 4,820 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $179,540. Estimated direct labor cost was $456,490 for 19,100 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,910 hours) $ 45,650 Indirect costs Indirect labor 2,420 Indirect materials 3,430 Factory rent 3,370 Factory supervision 4,860 Factory...
2.Appleby Manufacturing uses an activity-based costing system. The company produces Model F and Model G. Information...
2.Appleby Manufacturing uses an activity-based costing system. The company produces Model F and Model G. Information relating to the two products is as follows : Model F Model G Units produced 24,000 30,000 Machine hours 7,500 8,500 Direct labor hours 8,000 12,000 Material handling (number of moves) 4,000 6,000 Setups 5,000 7,000 Purchase orders 30 40 Inspections 10,000 14,000 Product line variations 8 12 The following overhead costs are reported for the following activities of the production process: Material handling...
Exercise 16-4 Manufacturing cost data for Orlando Company, which uses a job order cost system, are...
Exercise 16-4 Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.75 and final answers to 0 decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $ (a) $84,600 $69,950 Direct labor...
4.) X Company uses an activity-based costing allocation system. On January 1, 2020, its accountant budgeted...
4.) X Company uses an activity-based costing allocation system. On January 1, 2020, its accountant budgeted the following costs and cost drivers for three of the activities that are used in the ABC system: Activity   Budgeted cost   Cost driver Assembly   $134,000   92,700 parts Packaging   $80,400   13,000 finished units Purchasing   $53,600   4,700 purchase orders In May of 2020, 563 units of Product C were finished, requiring $10,100 of direct materials, 5,000 direct labor hours, 1,410 parts, and 34 purchase orders. How...
A 60.0-kg survivor of a cruise line disaster rests atop a block of Styrofoam insulation, using...
A 60.0-kg survivor of a cruise line disaster rests atop a block of Styrofoam insulation, using it as a raft. The Styrofoam has dimensions 2.00 m ✕ 2.00 m ✕ 0.0895 m. The bottom 0.021 m of the raft is submerged. (a) Draw a force diagram of the system consisting of the survivor and raft. (Submit a file with a maximum size of 1 MB.) (b) Write Newton's second law for the system in one dimension, using B for buoyancy,...
A 63.0-kg survivor of a cruise line disaster rests atop a block of Styrofoam insulation, using...
A 63.0-kg survivor of a cruise line disaster rests atop a block of Styrofoam insulation, using it as a raft. The Styrofoam has dimensions 2.00 m ? 2.00 m ? 0.0820 m. The bottom 0.025 m of the raft is submerged. (a) Draw a force diagram of the system consisting of the survivor and raft. (Submit a file with a maximum size of 1 MB.) This answer has not been graded yet. (b) Write Newton's second law for the system...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT