(a) In order to stabilise a section of a proposed road on a deep
soft clay layer, the vibro replacement technique is used. According
to the particle size distribution of the backfill material, the
following information is given:
D50 = 50 mm, D20 = 10 mm and D10 =
0.5 mm with a trace of fine grained soil (less than 3%). Check is
this soil can be used as a backfill material?
b) Explain why preloading and prefabricated vertical drains (PDV)
are used in the road formation stabilisation.
c) Write a short note about the Benkelman Beam and its uses.
Get Answers For Free
Most questions answered within 1 hours.