Paraphrasing this for me. Thank you
Introduction
Scheduling and project management is key to any mining operation
in achieving the most profitable and time-efficient strategy. A
Gantt chart has been developed to outline the cost and time frame
requirements of the overall task. Individual task breakdown
including cost and time analysis is also outlined in the Gantt
chart. Block cave mining for this project has been approved and the
underground development needs to be scheduled. Block cave mining is
a method of underground mining for large deposits of low-grade ore.
To begin mining the deposit, the underground infrastructure must be
developed to access the deposit.
Scope
This report aims to prepare a project schedule for the proposed
block caving mine. The start date for the proposed development
begins on the 20/9/2020. For time and cost calculations the
following parameters from table 1 were used.
Introduction
For any mining operation, scheduling and project management controls the most beneficial and time-efficient course of action. A Gantt charts is used to outline the cost and time frame needed for the entire task. The cost and time analysis of any single task is also available in the Gantt chart. For this project, block cave mining has been sanctioned and now underground development is to be planned. Block cave mining is a process of underground mining which is meant for large deposits of low-grade ore. The underground infrastructure should be generated to reach the deposit before starting the mining of deposit.
Scope
This report is intended to provide a project schedule for the suggested block caving mine. The proposed project activity s scheduled to start on 20/SEP/2020. The following variables for time and cost calculations were used from Table 1.