Rearrange the following activities and state if any one can be
done in parallel with the other while stating the reason
- Excavation.
- Surface dewatering.
- Assemble guide frame for secant piles.
- Excavate for reinforced concrete pile using CFA.
- Excavate for bentonite pile using CFA.
- Pour the Reinforced concrete piles.
- Pour bentonite pile.
- Erect Bracing Struts and Waler Beams.
- Removal of bracing struts and waler beams.
- Inject the water sealing plug.
- Formwork for basement raft foundation.
- Formwork for Basement Columns and Walls.
- Reinforcement for basement raft foundation.
- Reinforcement for Basement Columns and Walls.
- Put the reinforcement steel cage.
- Casting of Basement Raft Foundation.
- Casting for Basement Columns and Walls.
- Insulation of Basement Raft Foundation.
- Insulation of Basement Columns and Walls.
- Construction of Basement floor.