Question

Which of the following statements is true? Group of answer choices 1)The variance of the time...

Which of the following statements is true?

Group of answer choices

1)The variance of the time taken to complete an activity is equal to (b − a)/6.

2)The critical path is the path with the largest probability of being completed on time.

3)The standard deviation of a project completion time is the sum of the standard deviations for the critical path activities.

4)Three time estimates are necessary so that we can estimate the parameters of the Beta distribution.

thanks

Homework Answers

Answer #1

From the given choices the 4th answer is true because the activity duration (expected duration of the activity) follows beta distribution curve which is defined by three parameter such as a optimistic time, most likely time, pessimistic time.

1 is false because the variance of the time taken to complete an activity is equal to (b − a)2/6.

2 is false because critical path has only 50% probability

3 is false because standard deviation of a project completion time is square root of the sum of the variances for the critical path activity.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A landscaping project consists of the activities below. The following information describes the relationships between the...
A landscaping project consists of the activities below. The following information describes the relationships between the activities that need to be completed for this project.                         Immediate Activity      Predecessors                A      -                B      A                C      A                D      C                E       B, D Using the data above, develop a network for this project. The following are estimates of optimistic, most likely, and pessimistic times. Activity      Optimistic time Most Likely Time Pessimistic Time                A      3                                   4                                  ...
Which of the following statements is not correct? Group of answer choices The binomial option pricing...
Which of the following statements is not correct? Group of answer choices The binomial option pricing model when taken to the limit becomes the Black-Scholes option pricing model. The Black-Scholes model uses a continuous time discount factor. The binomial option pricing model use a ratio of the range values as the hedge ratio. The Black-Scholes model is related to a heat transfer equation and Brownian molecular motion. The Black Scholes model only estimates the intrinsic value of the call option....
Consider the following table: ACTIVITY    PREC. ACT.            TIME   ESTIMATES     (days)      &nbsp
Consider the following table: ACTIVITY    PREC. ACT.            TIME   ESTIMATES     (days)          to           tml                tp                                 te     A                     -----                        1                      2                      3                           B                      A                           2                      4                      6     C                      B                            1                      4                      7     D                      B                            3                      4                      5     E                      C                            1                      3                      5     F                      D, E                       2                      3                      4 1) Construct a PERT network. [NOTE: This is the most crucial part of the exercise. Make sure you have the correct network before proceeding to the next sections.] 2) By using ES, EF, LF, LS, find the slack of each activity and the critical path. 3) Find the completion time and the standard deviation (σ) for the project— round off the standard deviation to the nearest...
1.An l-value is not required to be a location in memory. Group of answer choices True...
1.An l-value is not required to be a location in memory. Group of answer choices True False 2. An l-value cannot have a value assigned to it, whereas an r-value can. Group of answer choices True False 3. In C++, the body of a for loop may never run, even once. Group of answer choices True False 4. When a C++ programmer declares a function, they are required to state all of the following except Group of answer choices {}...
Q1. Which of the following statements regarding Critical Path Method (CPM) networks is true? A) There...
Q1. Which of the following statements regarding Critical Path Method (CPM) networks is true? A) There can be multiple critical paths on the same project, all with different durations. B) The early finish of an activity is the latest early start of all preceding activities. C) The late start of an activity is its late finish plus its duration. D) If a specific project has multiple critical paths, all of them will not have the same duration. E) B) and...
Which of the following statements on time lines is CORRECT? Group of answer choices 1.Time lines...
Which of the following statements on time lines is CORRECT? Group of answer choices 1.Time lines cannot be constructed to deal with situations where some of the cash flows occur annually but others occur quarterly. 2.A time line is not meaningful unless all cash flows occur annually. 3.Time lines are not useful for visualizing complex problems prior to doing actual calculations. 4.Time lines can be constructed where some of the payments constitute an annuity but others are unequal and thus...
Activity Immediate Predecessor Optimistic Time Most-likely time Pessimistic Time A None 3 6 9 B A...
Activity Immediate Predecessor Optimistic Time Most-likely time Pessimistic Time A None 3 6 9 B A 3 5 7 C A 4 7 12 D B 4 8 10 E C 5 10 16 F D, E 3 4 5 G D, E 3 6 8 H F 5 6 10 I G 5 8 11 J H, I 3 3 3 (a). What is the expected time for each activity? (2 points) (b.) What is the variance for each...
19) Which of the following statements about teratogens is NOT true? Group of answer choices The...
19) Which of the following statements about teratogens is NOT true? Group of answer choices The time of exposure to a teratogen impacts the type and degree of damage to the fetus. Female fetuses are far more likely to be affected by teratogens than male fetuses. Teratogens come in a large variety of forms. The greater the dose of a teratogen, the greater the effect.
Which of the following statements about a bond is true? Group of answer choices A. If...
Which of the following statements about a bond is true? Group of answer choices A. If the yield curve is downward sloping, long-term yields are lower than short-term yields because market interest rates are expected to decrease. B. If the yield curve is downward sloping, long-term yields are lower than short-term yields because market interest rates are expected to increase C.The value of a bond cannot be traded in the market at its face value D. All else being equal,...
(a). State TWO contrasts between Pure Project Teams and Matrix Project Teams. Give an example of...
(a). State TWO contrasts between Pure Project Teams and Matrix Project Teams. Give an example of each. 3(b). The following data relates to the activities required for a project. Since exact duration for each activity is not known for certain, three time estimates were made, namely: - the optimistic, most likely and pessimistic time estimates. The precedence relationships are also shown in the data below. You will need to analyze this problem using what you learned in Chapter 18 of...