Question:As a materials engineer in charge of designing concrete
mix, what would you do in each...
Question
As a materials engineer in charge of designing concrete
mix, what would you do in each...
As a materials engineer in charge of designing concrete
mix, what would you do in each following case at job site? Explain
as briefly (preferably in a single sentence) as
possible.
The structure is subjected to freezing.
Ans:
Concrete is to be around closely spaced reinforcing steel.
Ans:
The required slump value was 75 mm, you have obtained 20 mm of
slump.
Ans:
The required slump value was 75 mm, you have obtained 100 mm of
slump.