3
A wide embankment 5m high is built on the ground described in the previous example. The material of this bank has a moisture content of 13% and a dry density of 1860kgm-3. Find the vertical effective stress in the clay at a depth of 7.33m below the original ground level.
4
Get Answers For Free
Most questions answered within 1 hours.