Question

A highway embankment is constructed from soil having a final compacted unit weight of 20.53 kN/m3...

A highway embankment is constructed from soil having a final compacted unit weight of 20.53 kN/m3 and a moisture content of 17.6%. The construction is undertaken by hauling soil from a nearby borrow pit. The soil in the borrow pit has a natural unit weight of 16.29 kN/m3 and a moisture content of 13.2%. Assuming there is no loss of moisture while carrying the soil from the pit to the embankment location, the volume of soil to be excavated from the borrow pit per cubic metre of compacted fill is?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A compacted earthfill embankment of 50,000 m3 final volume is being constructed as part of a...
A compacted earthfill embankment of 50,000 m3 final volume is being constructed as part of a motorway project. Material for the embankment is to be taken from a borrow pit, where the soil is found to have the following average properties: bulk density 1.940 Mg/m3 , water content 29.5% and specific gravity 2.69. The soil is mechanically excavated and transported in trucks which carry 6 tonnes of soil each when fully loaded. The soil is dumped on the embankment, spread...
Soil is to be excavated from a borrow pit to construct a 100-m-long trapezoidal levee that...
Soil is to be excavated from a borrow pit to construct a 100-m-long trapezoidal levee that is 3 meters high, 5 meters wide at the top, and 15 meters wide at the base. The in situ total unit weight of the soil in the borrow pit is 21.7 kN/m3 with a water content of 11.4%. If levee construction requires the soil to be placed at a void ratio of 0.47, determine the volume that should be excavated from the borrow...
For a given soil, the following are given: Gs = 2.67; moist unit weight is 17.61...
For a given soil, the following are given: Gs = 2.67; moist unit weight is 17.61 kN/m3, and moisture content = 10.8%. Determine the weight of water, in KN, to be added per cubic meter : 80% degree of saturation (kN/m3)
A very wide embankment 5 m high is constructed from a fill with a unit weight...
A very wide embankment 5 m high is constructed from a fill with a unit weight of 16 kN/m3 over a saturated sand deposit with the presence of water table coinciding with its top surface. At a depth of 3 m below the top surface of the sand deposit, determine the following: (a) total and effective vertical stresses before construction of the embankment, (b) increase in vertical stress induced by the construction of the embankment, and (c) total and effective...
For a moist soil, given total volume V = 0.22 m3; total weight W 3.124 kN;...
For a moist soil, given total volume V = 0.22 m3; total weight W 3.124 kN; moisture content w = 15% and specific gravity of soil solids, G = 2.65. Calculate the moist unit weight, dry unit weight ,void ratio, porosity, and degree of saturation.