Question

Q.For constructing an inground swimming pool, develop a network diagram for this project, breaking your project...

Q.For constructing an inground swimming pool, develop a network diagram for this project, breaking your project in to a minimum of 10 activities.


Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Swimming Pool Installation: You are the project manager working for Mack's Pool Co. Your project consists...
Swimming Pool Installation: You are the project manager working for Mack's Pool Co. Your project consists of installing a new swimming pool at the local country club before Memorial Day weekend (pool opening weekend). You would like to find the minimum cost schedule for your project. There is a $9,000 per week penalty for each week the project is delayed beyond week 9. In addition, your project team determined that indirect costs are $15,000 per week. ACTIVITY Immediate Predecessor (s)...
Develop a work breakdown structure for a house construction project a. Identify the predecessors and successors...
Develop a work breakdown structure for a house construction project a. Identify the predecessors and successors for activities in house construction project.    b. Draw a network diagram. (You can draw in paper, scan it and insert to your assignment or use computer to draw the diagram).
1. Given is a PERT project network diagram as shown below: Activity Start A B C...
1. Given is a PERT project network diagram as shown below: Activity Start A B C D E F G H I J K End Time 0 18 24 21 38 28 34 22 20 34 34 16 0    a) The Project Completion time =   b) The Earliest Start time, ES, of Activity F =   c) The Earliest Start time, ES, of Activity K =   d) The Latest Start time, LS, of Activity E =   e) The non-critical activities...
Given is a CPM project network diagram as shown below. Activity Start A B C D...
Given is a CPM project network diagram as shown below. Activity Start A B C D E F G H End days 0 2 6 8 3 4 2 3 2 0 a) The Project Completion time = ___ days. b) The Earliest Start time, ES, of Activity G = ____ days. c) The Latest Finish time, LF, of Acitivity C = ____ days. d) The critical activities are = ____ (ex. Fill in answer as: ABCD)
Given is a CPM project network diagram as shown below. Activity Start A B C D...
Given is a CPM project network diagram as shown below. Activity Start A B C D E F G H End days 0 2 6 8 3 4 2 3 2 0 a) The Project Completion time = ____ days. b) The Earliest Start time, ES, of Activity G = ____ days. c) The Latest Finish time, LF, of Acitivity C = ____ days. d) The critical activities are = ____ (ex. Fill in answer as: ABCD)
A rectangular swimming pool is to be built with an area of 800 square feet. The...
A rectangular swimming pool is to be built with an area of 800 square feet. The owner wants 5-foot-wide decks along either side and 10-foot-wide decks at the two ends. Find the dimensions of the smallest piece of property on which the pool can be built satisfying these conditions. Enter your answers in increasing order. ____ ft by ____ ft
What are the Activity Duration Estimates, Gantt Chart, and Activity Network Diagram used for project schedule?
What are the Activity Duration Estimates, Gantt Chart, and Activity Network Diagram used for project schedule?
The following information is known about a project: a. Draw a network diagram b. Calculate the...
The following information is known about a project: a. Draw a network diagram b. Calculate the ES, EF, LS, LF and slack time and find the critical path for this project Activity Activity Time (days) Immediate Predecessor A 12 B 9 C 10 A D 10 A,B E 24 B F 10 A G 35 C H 40 D I 15 A J 4 E,G,H K 6 F,I,J
It's nighttime, and you've dropped your goggles into a 3.1-m-deep swimming pool. If you hold a...
It's nighttime, and you've dropped your goggles into a 3.1-m-deep swimming pool. If you hold a laser pointer 0.80 m above the edge of the pool, you can illuminate the goggles if the laser beam enters the water 1.8 m from the edge. How far in meters are the goggles from the edge of the pool?
A swimming pool can be filled by any one of four different hosepipes in 8, 10,...
A swimming pool can be filled by any one of four different hosepipes in 8, 10, 16 or 20 hours. How long will it take to fill the pool if all four hosepipes are used at the same time, without reducing the water pressure? Express your answer in hours and minutes, rounded to the nearest minute.
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT