Question

an upstream reservoir with starting water level of 100m drains into a downstream reservoir with starting...

an upstream reservoir with starting water level of 100m drains into a downstream reservoir with starting level of 50m via a pipe. The pipe has a 250m diameter, a 1000m length and C factor of 120. The upstream and downstream reservoirs each have cross sectional area of 5 meter squared.

Determine the steady state flow in the pipe at t=0

Determine the flow in the pipe and water levels in the upstream and downstream reservoirs over a period of 5 minutes. Hint: Assume quasi-steady state conditions in the pipe and the reservoirs and use a time step of 5 seconds in your simulation

Homework Answers

Answer #1

please upvote my answer thanks please upvote it

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
An 18-in diameter pipeline (L = 30,000 ft, ε = 0.0045 ft) connects 2 water reservoirs....
An 18-in diameter pipeline (L = 30,000 ft, ε = 0.0045 ft) connects 2 water reservoirs. The upstream reservoir elevation is 825 ft and the downstream reservoir elevation is 600 ft. a) Assume f = 0.023 and calculate steady state flow rate (ft3/sec) in the pipeline b) Check validity of friction factor assumption if water temperature is 50°F c) Briefly explain why your calculated velocity in this pipe is acceptable
An elevated water reservoir (water level at 210 m) is to supply a lower groundwater reservoir...
An elevated water reservoir (water level at 210 m) is to supply a lower groundwater reservoir (water level at 138 m). The reservoirs are connected by 800 m of 400 mm ductile cast pipe (C = 100) and 1200 m of 300 mm ductile cast-iron pipe (C = 100) in series. (a) What will be the discharge delivered from the upper reservoir to the lower one? (b) If the water demand increases by 50% in the future, determine the required...
Part I. Indicate whether true or false (T or F). ____ Storm water detention ponds typically...
Part I. Indicate whether true or false (T or F). ____ Storm water detention ponds typically are designed to regulate the outflow peak rate at or below a single target value, such as the pre-development (pre-land use change) peak runoff rate for a specified return period event. Detention storage alters the peak but not the volume of the outflow hydrograph. _____ Typical rating curves for weirs are concave upward. Typical rating curves for orifices are concave downward. ____ A sediment...