The drinking water treatment plant is typically upgraded in terms of both water quantity (flow rate)...

The drinking water treatment plant is typically upgraded in terms of both water quantity (flow rate) and quality (conversion). At present, 90% of a contaminant A is degraded by a first-order reaction in a single CSTR treating source water. We plan to add an identical reactor having the same volume to the existing one in series in order to improve the performance of current treatment plant.

(a) For the same flow rate as presently used, how will this addition affect the removal of contaminant A?

(b) If the same 90% conversion is acceptable (CSTR in series) and thus kept, how much can the flow rate be increased by this addition?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The chlorine contact tank of a water treatment plant is 69.5 m3 . The plant is...
The chlorine contact tank of a water treatment plant is 69.5 m3 . The plant is treating water at flow rate of 123456 m3 /week.The applied Ct value for 99.9% removal of Giardia protozoa is about 175 mg.min/L to achieve current drinking water standards. The new water standards need 99.999% removal of the same microbe to save population from Giardia infection. What would be the new chlorine dosage (mg/L) to satisfy the new water standard? Assume no infrastructure change.
The Busy Town drinking water treatment plant recently changed coagulant aid from alum to ferrous sulfate...
The Busy Town drinking water treatment plant recently changed coagulant aid from alum to ferrous sulfate (FeSO4·7H2O) for TSS removal. The raw water contains 7 mg/L of TSS. Ferrous sulfate coagulation proceeds as follows: FeSO4·7H2O + 2 Ca(HCO3-) + 1⁄2O2 -> 2Fe(OH)3 (s) ↓ + 2CaSO4 + 13H2O If an optimum dose of 30 mg/L of ferrous sulfate is required to remove 90% of the TSS, calculate the mass of residuals (mg/L) generated in this process.
Question 1 You are assigned to carry out a preliminary design for a water treatment process....
Question 1 You are assigned to carry out a preliminary design for a water treatment process. A pollutant of concern, denoted ‘A’, is known to degrade in water. But you do not know the rate law or reaction rate constant. You conduct a series of experiments. In each case, you established an initial concentration of 50 mg/L of pollutant ‘A’ in water in a sealed vessel. After a certain period, you open the vessel and measure the remaining concentration of...
Design a cubic rapid mixer for a water treatment plant with a peak flow rate of...
Design a cubic rapid mixer for a water treatment plant with a peak flow rate of 20,000 m3/d.  Assume the velocity gradient G in the mixer is to be at least 1,000 s-1and the detention time is at least 10 s. Determine the size of the mixing tank, the power input, and the rotational speed of the mixer if the radial flow impeller power number is 6.0
Design high-rate sedimentation tank(s) for a water treatment plant using plate settlers. 1. Design the rectangular...
Design high-rate sedimentation tank(s) for a water treatment plant using plate settlers. 1. Design the rectangular sedimentation tank(s), including launders and sludge collection mechanism. 2. Design the countercurrent plate settlers, including length, angle, and distance between plates (to achieve 100% removal of the target particle described below). 3. Draw a cross-section of the sedimentation tank with dimensions, indicating the concrete walls, main pipes, launders, plate settlers. 4. Quantify/discuss the improvement(s) that may result from installing the plate settlers. Inputs: Design...
Sign In INNOVATION Deep Change: How Operational Innovation Can Transform Your Company by Michael Hammer From...
Sign In INNOVATION Deep Change: How Operational Innovation Can Transform Your Company by Michael Hammer From the April 2004 Issue Save Share 8.95 In 1991, Progressive Insurance, an automobile insurer based in Mayfield Village, Ohio, had approximately $1.3 billion in sales. By 2002, that figure had grown to $9.5 billion. What fashionable strategies did Progressive employ to achieve sevenfold growth in just over a decade? Was it positioned in a high-growth industry? Hardly. Auto insurance is a mature, 100-year-old industry...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary rivals? How will the acquisition of Reebok by Adidas impact the structure of the athletic shoe industry? Is this likely to be favorable or unfavorable for New Balance? 2- What issues does New Balance management need to address? 3-What recommendations would you make to New Balance Management? What does New Balance need to do to continue to be successful? Should management continue to invest...
What tools could AA leaders have used to increase their awareness of internal and external issues?...
What tools could AA leaders have used to increase their awareness of internal and external issues? ???ALASKA AIRLINES: NAVIGATING CHANGE In the autumn of 2007, Alaska Airlines executives adjourned at the end of a long and stressful day in the midst of a multi-day strategic planning session. Most headed outside to relax, unwind and enjoy a bonfire on the shore of Semiahmoo Spit, outside the meeting venue in Blaine, a seaport town in northwest Washington state. Meanwhile, several members of...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT