A sewer pipe must be laid from a starting invert elevation of 348.25 ft at station 10+00 and must past through an invert elevation of 346.50 at station 13+52.80 and continue on at that grade. Determine the uniform grade needed and calculate the invert elevations at Sta's I l, 12, 13, 14 and 15.
Get Answers For Free
Most questions answered within 1 hours.