Data from the given question are as follows:
Grade of concrete = M5 (1:5:10)
Amount of cement in this mix = 1/(1+5+10)
Volume of dry cement = 0.347 m3
Vol. of 1 block = 980400 mm3 = 0.0009804 m3
60 litre of water is required for 50 kg of cement or 1 bag of cement in case of M5 grade concrete (IS 456 Code)
For 1 cubic metre of cement we need to add dry volume of 0.347 cubic metre to account for the losses
Thus cement content = 1+0.347 = 1.347 m3
Cement per cubic metre
=1.347 x 1440 x (1/(1+5+10)) = 121.23 kg/m3
Cement per block:. = 0.0009804 x 121.23 = 0.1188 kg
(Where density of cement = 1440 kg per cum)
Water required for 50 kg cement = 60 L
Thus water required for 0.1188 kg cement = 0.14256 L = 142.56 millilitres
Answer : 142.6 ml