Question

Inspection by the Designer (A/E) is for the benefit of the the builder/ contractor. True or...

Inspection by the Designer (A/E) is for the benefit of the the builder/ contractor.
True or False

Homework Answers

Answer #1

True .

Definately inspection by the designer (A/E) is beneficial for the builder or contractor.

There are various inspections where a contractor or builder need inspection of A/E

1. Concrete production inspection

2. Inspection and testing of concrete

3. Preplacement inspection

4. Placement inspection

5. Post placement inspection

6. Inspection for Precast erection

All projects get benifits from inspections. A small project may require only small list of items to be inspected

Quality control inspection by A/E plays an vital role in benifits of owner and contractors.

In inspection thing are checked deeply by experienced A/E and they know what is required and what is not required.

They help owner and contractors in stopping unnecessary works , equipments.

It is assumed that A/E save project cost in greater extent.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A home inspection should be performed by a?qualified professional, unless the structure appears sound. a) True...
A home inspection should be performed by a?qualified professional, unless the structure appears sound. a) True b) False
16- When an owner makes an agreement with a contractor to perform the work at a...
16- When an owner makes an agreement with a contractor to perform the work at a fixed price, this is known as a ________ ________ delivery process. 17- AIA Contract Document Integrated project delivery guide provides a tool to assist owners, designer, and builders to move toward integrated models and improved design, construction, and operations processes True False 18- With the design-built contract the owner is totally responsible and engaged with the construction operations yet making sure that the project...
Regarding Federal Government Contracting: 1. True or False: DCMA’s functions are limited to contract administration and...
Regarding Federal Government Contracting: 1. True or False: DCMA’s functions are limited to contract administration and quality assurance. 2. True or False: It is important to impose tight budgetary controls on fixed price contracts than on cost type contracts. 3. True or False: Under fixed price contracts, after inspection has been made and the delivered items are accepted, the contractor is paid. 4. True or False: The first step upon receipt of an advance copy of the contract is to...
Which Statement is True? Finance Related Question A.)In cost benefit analysis, a benefit of the same...
Which Statement is True? Finance Related Question A.)In cost benefit analysis, a benefit of the same magnitude that comes farther in the future has a smaller present value B.)When a discount rate increases the present value of a future benefit also increases C.) Both Statements are false
(a) TRUE / FALSE If X is a random variable, then (E[X])^2 ≤ E[X^2]. (b) TRUE...
(a) TRUE / FALSE If X is a random variable, then (E[X])^2 ≤ E[X^2]. (b) TRUE / FALSE If Cov(X,Y) = 0, then X and Y are independent. (c) TRUE / FALSE If P(A) = 0.5 and P(B) = 0.5, then P(AB) = 0.25. (d) TRUE / FALSE There exist events A,B with P(A)not equal to 0 and P(B)not equal to 0 for which A and B are both independent and mutually exclusive. (e) TRUE / FALSE Var(X+Y) = Var(X)...
Well-timed verbal feedback has the side benefit of keeping a listener attentive to a message. True...
Well-timed verbal feedback has the side benefit of keeping a listener attentive to a message. True False
True or False A benefit of mutual funds is that you don’t have to worry about...
True or False A benefit of mutual funds is that you don’t have to worry about being stopped out. Smart beta funds are actively managed funds that focus on fundamental factors.
1. TRUE OR FALSE: Closed specs are NOT permitted in a private project. 2. The main...
1. TRUE OR FALSE: Closed specs are NOT permitted in a private project. 2. The main issue of a double form bond is: A These are not enforceable in court B These bonds have many regulations attached C They are hard to cover by the surety D An issue can eat up the bond quickly leaving little for other issues 3. Bonding capacity can be higher if A Bonding capacity is based on none of these B The contractor confines...
True or False. Suppose a certain good provides an external benefit. if the private cost of...
True or False. Suppose a certain good provides an external benefit. if the private cost of the last unit of the good that was produced is equal to the social value of that unit, then the sum of producer and consumer surplus is maximized.
Given: Treatment E: Cost = $5,000, benefit = survival rate of 60% Treatment F: Cost =...
Given: Treatment E: Cost = $5,000, benefit = survival rate of 60% Treatment F: Cost = $7,000, benefit = survival rate of 50% Treatment G: Cost = $4,000, benefit = survival rate of 40% Treatment H: Cost =$5,000, benefit = survival rate of 30% Treatment K: Cost =$3,000, benefit = survival rate of 55% Treatment J: Cost = $6,000, benefit = survival rate of 68% 1 Which one is true? no treatment is marginally dominated Treatment K is marginally dominated...