A concrete drain pipe is designed on a slope of 0.5% to convey 140 cfs of peak storm runoff. Assume the following pipe diameters are commercially available: 12-in, 15-in, 18-in, 21-in, 24-in, 27-in, 30-in, 36-in, 42-in, 48-in, 54-in, 60-in, 66-in and 72-in
a) State design assumptions
b) Specify diameter of pipe
c) Show that velocity in pipe is acceptable
Get Answers For Free
Most questions answered within 1 hours.