Question

Design a completely mixed activated sludge process using three different design approaches (i.e. calculate the volume...

Design a completely mixed activated sludge process using three different design approaches (i.e. calculate the volume of the aeration basin). Base your design for the first approach on detention time, for the second one on BOD loading, and the third one on kinetics. The influent design flow rate to the activated sludge process is 10,000 m3 /day with a BOD5 concentration of 200mg/L. Completely mixed activated sludge processes typically have a detention time ranging from 3 to 6 hours and BOD5 loadings ranging from 50 to 120 lb BOD5(d·1000 ft3 ). Typical biokinetic coefficients used in design are Y = 0.6mg VSS/mg BOD5, k= 3 d -1, Ks = 60 mg/L, and kd = 0.06 d-1. Use a MCRT = 10 days and X = 2500 mg/L VSS.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A completely mixed activated-sludge process is being designed for a wastewater flow of (2.64 mgd) using...
A completely mixed activated-sludge process is being designed for a wastewater flow of (2.64 mgd) using the kinetics equations. The influent BOD of 120 mg/Lis essentially all soluble and the design effluent soluble BOD is 7 mg/L, which is based on a total effluent BOD of 20 mg/L. For sizing the aeration tank, the mean cell residence time is selected to be10 days and the MLVSS 2000 mg/L. The kinetic constants from a bench-scale treatability study are as follows: Y...
Sooner City Reclamation Plant is a completely mixed activated sludge process designed to treat 20,000 m3/d...
Sooner City Reclamation Plant is a completely mixed activated sludge process designed to treat 20,000 m3/d of domestic wastewater having an influent BOD5 concentration of 350 mg/L (assume a 28.6% reduction in during primary treatment). Use typical activated sludge kinetic constants except for kd = 0.06 1/d. Assume that the MLVSS concentration in the aeration basin is maintained at 3,000 mg/L and the ratio of VSS:TSS is 0.75. Permit requires that the effluent BOD5 and TSS concentrations do not exceed...
A completely mixed activated sludge process is designed to treat 20,000 m3 /d of domestic wastewater...
A completely mixed activated sludge process is designed to treat 20,000 m3 /d of domestic wastewater having a BOD5 concentration of 250 mg/L following primary treatment. The NPDES permit requirement for effluent BOD5 and TSS is 20 mg/L for each. The biokinetic parameters have been established as: yield = 0.6 , k = 5/d, Ks = 60 mg/L, and kd = 0.06/d. The MLVSS concentration in the aeration tank is to be maintained at 3000 mg/L and the ratio of...
A conventional activated sludge plant treating a domestic flow of 150 ML/d is operated at a...
A conventional activated sludge plant treating a domestic flow of 150 ML/d is operated at a SRT of 10 d with a MLVSS of 3500 ppm. The activated sludge plant is required to reduce the influent BOD from 200 ppm to less than 10 ppm prior to discharge. The discharge from the aeration basin is clarified, such that the clarifier overflow contains no particulate material and the MLVSS of the recycle stream is 8000 ppm. You are required to determine...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process for a town of 40,000 people. The industrial flow contribution to the sewer system is 300,000 gallons per day. Effluent discharge standards require effluent BOD5 and total suspended solids concentration of <10 mg/l. Assume the following design criteria are applicable: Domestic sewage flow = 100 gal/cap/day (including I/I) BOD loading = 0.18 lbs/cap/day TSS loading = 0.20 lbs/cap/day BOD removal in primary = 33%...
Estimate the volume of air to be supplied (m3/d) for an activated sludge system with a...
Estimate the volume of air to be supplied (m3/d) for an activated sludge system with a flow of 0.25 m3/sec, net waste activated sludge production of 340 kg/day VSS, and an influent soluble BOD5 of 74 mg/L. Assume that soluble BOD5 is 58% of BODL, BOD5 in the aeration tank is 14 mg/L, and that the oxygen transfer efficiency is 9%. Density of air is 1.185 kg/m3, and air has 23.2% oxygen.
A complete mixed activated sludge process aeration tank treats 5 MLD sewage having the influent and...
A complete mixed activated sludge process aeration tank treats 5 MLD sewage having the influent and effluent soluble BOD concentrations of 220 and 20 mg/L respectively. The volume of the aeration tank is 5060 m3 and the mean cell residence time is 10 days. MLVSS in aeration tank is 3,400 mg/L, MLVSS/MLSS = 0.8 and sludge wastage rate is 1 m3/hour. Calculate the concentration of return sludge suspended solids ?
An activated sludge tank has the following characteristics: Q = 4.18 m3/sec; Influent BOD5 = 225...
An activated sludge tank has the following characteristics: Q = 4.18 m3/sec; Influent BOD5 = 225 mg/L; Effluent BOD5 = 4.5 mg/L; Ks = 100 mg/L; μm = 2.5 day-1; kd = 0.05 day-1. The mean cell residence time (MCRT) in days is most nearly: a.12.4 b.7.0 c.2.5 d.17.4 QUESTION 38 The hydraulic detention time, θc, of the activated sludge tank above (in Question #37) in hours is most nearly: (Note: Cells in the activated sludge tank, X = 3,500...
A conventional activated sludge plant is to treat 1 MGD of ww with a BOD5 of...
A conventional activated sludge plant is to treat 1 MGD of ww with a BOD5 of 200 mg/L after settling. The process loading is 0.30 lb BOD/d-lb MLVSS. The detention time is 6 hr and the recirculation ratio is 0.33. Determine the value of MLVSS.
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant (WWTP) to a secondary plant that can meet an effluent standard of 25 mg/L BOD5 and 30 mg/L suspended solids. They have selected a completely mixed activated sludge system for the upgrade. The existing primary treatment plant has a flow rate of 0.029 m3/s. The effluent from the primary tank has a BOD5 of 240 mg/L. Using the following assumptions, estimate the required volume...