Question

A clean lake with a constant volume of 107 m3 is fed by a pollution-free stream...

A clean lake with a constant volume of 107 m3 is fed by a pollution-free stream with flow rate of 50 m3/s.
A factory dumps 5.0 m3/s of waste with a pollutant concentration of 100 mg/L into the lake. The pollutant
has a first-order reaction rate coefficient (decay) of 0.25 d-1. Assuming the pollutant is well-mixed in the
lake. How long does it take the lake to reach the steady-state concentration? You may assume that if
concentration is approximately 99% of the steady-state concentration, the system is considered to
reach steady-state.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider a 20 * 105 m3 lake fed by a polluted stream having a flow rate...
Consider a 20 * 105 m3 lake fed by a polluted stream having a flow rate of 4.2 m3/s and pollutant concentration equal to 25 mg/L. There is also a sewage outfall that discharges 0.5 m3/s of wastewater having a pollutant concentration of 275 mg/L. The stream and sewage wastes have a second order decay rate of 0.32/day. Assuming the pollutant is completely mixed in the lake and assuming no evaporation or other water losses or gains, find the steady-state...
A lake with volume 5E6 m3 has a freshwater flow of 20 m3/s. Waste is dumped...
A lake with volume 5E6 m3 has a freshwater flow of 20 m3/s. Waste is dumped into lake at 50 g/s with a decay rate of 0.2/d. What is the steady state contaminant concentration in the lake in mg/L if the lake is completely mixed?
Consider a 50 x 10^6 m^3 lake fed by a polluted stream with a flow rate...
Consider a 50 x 10^6 m^3 lake fed by a polluted stream with a flow rate of 75 m^3/s and a pollutant concentration of 25.5 mg/L. There is also a sewage outfall that discharges 3.0 m^3/s of wastewater with a pollutant concentration of 125 mg/L. Stream and sewage waste have a reaction rate coefficient of 5% per day. Find the steady-state (i.e., effluent) pollutant concentration and flow rate.
Consider a lake that is fed by mix of two streams: one stream has a flow...
Consider a lake that is fed by mix of two streams: one stream has a flow rate of N m3/s and BOD concentration of 10 mg/L. The other is a sewage outfall that discharges 0.6 m3/s and a BOD concentration of 40 mg/L. Assuming the pollution is completely mixed in the stream, find the resulting BOD concentration
You are tasked with conducting BOD studies for a waste treatment facility and its discharge to...
You are tasked with conducting BOD studies for a waste treatment facility and its discharge to a nearby river. You are told that the facility removes 93% of the BOD in total with a discharge rate of 1.0 m3 /s. you sample the receiving water and find that it has a 0.5 mg/L deficit from saturation concentration (saturation is at 9.7 mg/L) and a BOD5 content of 10 mg/L. The river flows at a speed of 0.25 m/s and has...
You are tasked with conducting BOD studies for a waste treatment facility and its discharge to...
You are tasked with conducting BOD studies for a waste treatment facility and its discharge to a nearby river. You are told that the facility removes 93% of the BOD in total with a discharge rate of 1.0 m3 /s. you sample the receiving water and find that it has a 0.5 mg/L deficit from saturation concentration (saturation is at 9.7 mg/L) and a BOD5 content of 10 mg/L. The river flows at a speed of 0.25 m/s and has...
Please show me how to apply CVP analysis for this case study. FLY ASH BRICK PROJECT:...
Please show me how to apply CVP analysis for this case study. FLY ASH BRICK PROJECT: FEASIBILITY STUDY USING CVP ANALYSIS S. K. Mitra and Shubhra Hajela wrote this case solely to provide material for class discussion. The authors do not intend to illustrate either effective or ineffective handling of a managerial situation. The authors may have disguised certain names and other identifying information to protect confidentiality. This publication may not be transmitted, photocopied, digitized or otherwise reproduced in any...