Question

What is the purpose and importance of tying rebar together at the construction site?

What is the purpose and importance of tying rebar together at the construction site?

Homework Answers

Answer #1

The rebars are provided in concrete member to take up tension developed in concrete due to loading.The rebars are of specified diameter and at a fixed designed spacing so they take up the tension for which they were designed.During concreting due to movement of labour and equipment and pouring of concrete this spacing of rebars and their position gets adversely affected and can change substantially. This will seriously affect their effectiveness against tension.

In order to ensure that this does not happen the rebars are tied together at the construction site before pouring concrete.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
For a construction site, describe the importance of accurate survey data. And what would happen if...
For a construction site, describe the importance of accurate survey data. And what would happen if no survey was done prior to the project start? I would really appreciate a typed answer.
What if the top soil of the site is not removed prior to commencing the construction...
What if the top soil of the site is not removed prior to commencing the construction on site?
What is the importance of an accounting policy & its relevance to users of general purpose...
What is the importance of an accounting policy & its relevance to users of general purpose financial statements?
What is the purpose/importance of Earnings Per Share (EPS) reporting on the Income Statement? What is...
What is the purpose/importance of Earnings Per Share (EPS) reporting on the Income Statement? What is diluted EPS and why must it be computed and reported?
It is required to dewater a construction site 80m x 80m. The bottom of the construction...
It is required to dewater a construction site 80m x 80m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5 m diameter wells at the corners of the site. The transmissivity and the storage coefficient of the aquifer are 1600 m2/day and 0.16, respectively. The site needs to be ready after 1 month of pumping. Determine required pumping rate.
At a distance of 100 m from a construction site, the sound intensity level is 90...
At a distance of 100 m from a construction site, the sound intensity level is 90 dB.  Assume the sound produced from construction site is isotropic, at what distance in meters is the intensity level 122 dB?
Describe the importance of the different conformations the DNA takes within the active site of the...
Describe the importance of the different conformations the DNA takes within the active site of the RT.
Explain the purpose of the presentation, including a persuasive case for the importance of the accounting...
Explain the purpose of the presentation, including a persuasive case for the importance of the accounting information to be shared."
Q2: Comment on the importance of setbacks for planning a new construction in the Sultanate of...
Q2: Comment on the importance of setbacks for planning a new construction in the Sultanate of Oman Write by microsoft word ( text )
It is required to dewater a construction site 80m x 80m at UCF. The bottom of...
It is required to dewater a construction site 80m x 80m at UCF. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5 m diameter wells at the corners of the site. The transmissivity and the storage coefficient of the aquifer are 1600 m2/day and 0.16, respectively. The site needs to be ready after 1 month of pumping. Determine the required pumping rate.
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT