The Problem involves building a 12 – foot diameter sewer at a bottom depth of 40 feet in loose sand with a water table at a depth of 8 feet. The alignment is along city streets. The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project. The sewer is ten miles in length.
Solution;